Read Panasonic DMC-FP7P / DMC-FP7PC / DMC-FP7PR / DMC-FP7PU / DMC-FP7EE / DMC-FP7EG / DMC-FP7EP / DMC-FP7GA / DMC-FP7GC / DMC-FP7GF / DMC-FP7GK / DMC-FP7GT Service Manual online
DMC-FP7PC
DMC-FP7PR
DMC-FP7PU
DMC-FP7EE
DMC-FP7EG
DMC-FP7EP
DMC-FP7GA
DMC-FP7GC
DMC-FP7GF
DMC-FP7GK
DMC-FP7GT
(K)...........Black Type
(N)...........Gold Type (only GK/GT)
(R)...........Red Type (except PR/GT)
(P)...........Pink Type (only PU/GA/GC/GF/GK/GT)
(A)...........Blue Type (only P/PC/PU/GK/GT)
(S)...........Silver Type (only GA/GC/GF/GK)
1.2. Leakage Current Cold Check ---------------------------3
1.3. Leakage Current Hot Check (See Figure 1.) --------3
1.4. How to Discharge the E.Capacitor on Flash
2.4. How to Replace the Lithium Battery -------------------7
3.2. General Description About Lead Free Solder
5 Location of Controls and Components------------------ 14
6 Service Mode ----------------------------------------------------- 19
8.2. PCB Location---------------------------------------------- 23
8.3. Disassembly Procedure -------------------------------- 24
9.2. Before Disassembling the unit ------------------------ 32
9.3. Details of Electrical Adjustment----------------------- 34
9.4. After Adjustment------------------------------------------ 38
which are important for safety. These parts are marked by
tial that these critical parts should be replaced with manu-
facturer’s specified parts to prevent X-RADIATION,
shock, fire, or other hazards. Do not modify the original
design without permission of manufacturer.
from the AC power line. Use a transformer of adequate
power rating as this protects the technician from acci-
dents resulting in personal injury from electrical shocks. It
will also protect AC Adaptor from being damaged by acci-
dental shorting that may occur during servicing.
heated or damaged by the short circuit.
properly installed.
shock hazards.
lic cabinet part on the equipment such as screwheads,
connectors, control shafts, etc. When the exposed metal-
lic part has a return path to the chassis, the reading
should be between 1 M
reading must be infinity.
(See Figure 1.)
and a good earth ground, as shown in Figure 1.
lent) may be used to make the hot checks, leakage cur-
rent must not exceed 1/2 mA. In case a measurement is
outside of the limits specified, there is a possibility of a
shock hazard, and the equipment should be repaired and
rechecked before it is returned to the customer.
2. Be careful of the high voltage circuit on FLASH P.C.B. when servicing.
2. Install the insulation tube onto the lead part of resistor (ERG5SJ102:1k
4. After discharging, confirm that the E.capacitor voltage is lower than 10V using a voltmeter.