Read JBL SDP-40 HD EMC - CB Certificate online
TEST NUMBER - 254-05
TEST PROCEDURES
1. TEST EQUIPMENT
A. Voltech Power Analyzer, Model Pmi, S/N 00534644
Calibration Date: 9-17-2003, calibrated annually.
2. TEST PROCEDURES.
test procedure:
The EUT, associated cables and peripheral devices are placed on the
supporting table. The EUT is connected to the Power Analyzer. The EUT is
turned on and any necessary operating or test software installed. The test is
run for the intervals called out in EN61000-3-3 and then EN61000-3-2.
turned on and any necessary operating or test software installed. The test is
run for the intervals called out in EN61000-3-3 and then EN61000-3-2.
All measurements are made according to the procedures defined in:
"EN61000-3-3:1995 with amendment A1:2001 Part 3-3: Limits-Limitation of
voltage changes, voltage fluctuations and flicker in public low-voltage supply
voltage changes, voltage fluctuations and flicker in public low-voltage supply
systems for equipment with rated current
≤ 16A per phase and not subject to
conditional connection" and "EN61000-3-2:2000 Part 3-2: Limits - Limits for
harmonic current emissions (equipment input current
≤16 A per phase)”
Page 5 of 18
Compliance Worldwide, Inc. - 357 Main Street - Sandown, NH 03873
(603) 887 3903 Fax 887 6445
Click on the first or last page to see other SDP-40 HD service manuals if exist.