Read JBL ON TIME 200ID EMC - CB Certificate online
<12014165 001>
Page 13 of 73
IEC 60065
Clause
Requirement – Test
Result - Remark
Verdict
IEC60065E
ASTABEAB
12.1.4
Drop test for portable apparatus where mass = 7
kg
kg
N/A
12.1.5
Thermoplastic enclosures stress relief test
N/A
12.2
Fixing of knobs, push buttons, keys and levers
No such parts provided.
N/A
12.3
Remote controls with hazardous live parts
No remote control provided.
N/A
12.4
Drawers (pull test 50 N, 10 s)
No drawers provided.
N/A
12.5
Antenna coaxial sockets providing isolation
No antenna coaxial sockets provided.
N/A
12.6
Telescoping or rod antennas construction
Not such a construction.
N/A
12.6.1
Telescoping or rod antennas securement
N/A
13
CLEARANCE AND CREEPAGE DISTANCES
P
13.1
Clearances in accordance with 13.3
Clearance measured according to annex
E. Pollution degree 2 was considered.
E. Pollution degree 2 was considered.
P
Creepage distances in accordance with 13.4
Creepage distances measured according
to annex E. Pollution degree 2 was
considered.
to annex E. Pollution degree 2 was
considered.
P
13.2
Determination of operating voltage
For obtaining the operating voltages the
EUT was connected to a 240 V TN
power system.
EUT was connected to a 240 V TN
power system.
The highest operating voltages are
measured as follows:
measured as follows:
pins
Vpk Vrms
T1
1-A
288 151
2-A
292 155
4-A
334 155
5-A 440 228
1-B 398 181
2-B 202 126
4-B 210 126
5-B 496 272
1-B 398 181
2-B 202 126
4-B 210 126
5-B 496 272
P
13.3
Clearances
See below.
P
13.3.2
Circuits conductively connected to the mains
comply with table 8 and, where applicable, table 9
comply with table 8 and, where applicable, table 9
(see appended table)
P
13.3.3
Circuits not conductively connected to the mains
comply with table 10
comply with table 10
N/A
13.3.4
Measurement of transient voltages
N/A
Click on the first or last page to see other ON TIME 200ID service manuals if exist.