ON TIME 200ID (serv.man2) - JBL Audio EMC - CB Certificate (repair manual). Page 10

Read JBL ON TIME 200ID (serv.man2) EMC - CB Certificate online

 
 
<12014165 001> 
 
 
Page 9 of 73 
 
IEC 60065 
Clause 
Requirement – Test 
Result - Remark 
Verdict 
 
IEC60065E 
 
ASTABEAB 
 
Separation by earthed conductive part 
 
N/A 
8.8 
Double Insulation: the Basic or Supplementary 
insulation > 0,4 mm (mm) ....................................... : 
See below. 
 
Reinforced insulation > 0,4 mm (mm)  .................... :  Photo-coupler and enclosure provided 
distance through insulation of 0,4mm 
minimum. Detail see appended table. 
 
Thin sheet insulation used inside the enclosure. 
See below. 
 
Basic or supplementary insulation, at least two 
layers, each meeting 10.3 dielectric 
 
N/A 
 
Basic or supplementary insulation, three layers any 
two of which meet 10.3 dielectric 
 
N/A 
 
Reinforced insulation, two layers each of which 
meet 10.3 dielectric 
Two layers of insulation tapes are used 
for T1, primary heat sink and secondary 
heat sink. 
Each one layer meets electric strength of 
10.3. 
 
Reinforced insulation, three layers any two which 
meet 10.3 dielectric 
 
N/A 
8.9 
Primary Wiring: Adequate insulation between 
internal hazardous live conductors and accessible 
parts 
Adequate insulation between primary 
circuits and accessible parts. 
 
Secondary Wiring: Adequate insulation between 
internal hazardous live parts and conductors 
connected to accessible parts 
Adequate insulation between internal 
hazardous live parts and secondary 
internal wire. 
8.10 
Class II Wiring: 
(1) Primary: Double insulation between conductors 
connected to the mains and accessible parts. 
(2) Secondary: Double insulation between 
conductors connected to accessible parts and the 
mains 
See above. 
8.11 
Detaching of wires 
The wires are inserted into a hole in 
PCB before soldering. 
There’s no risk of a wire becoming 
detached in the sense of this standard. 
 
No undue reduction of creepages or clearance 
distances if wires become detached 
The wires in secondary side are fixed 
with double methods, there’s no risk of a 
wire becoming detached. 
 
Vibration test carried out  ......................................... :  Vibration test is carries out according to 
clause 12.1.2. 
Page of 91
Display

Click on the first or last page to see other ON TIME 200ID (serv.man2) service manuals if exist.