Read JBL ON TIME 200ID (serv.man2) EMC - CB Certificate online
<12014165 001>
Page 9 of 73
IEC 60065
Clause
Requirement – Test
Result - Remark
Verdict
IEC60065E
ASTABEAB
Separation by earthed conductive part
N/A
8.8
Double Insulation: the Basic or Supplementary
insulation > 0,4 mm (mm) ....................................... :
insulation > 0,4 mm (mm) ....................................... :
See below.
P
Reinforced insulation > 0,4 mm (mm) .................... : Photo-coupler and enclosure provided
distance through insulation of 0,4mm
minimum. Detail see appended table.
minimum. Detail see appended table.
P
Thin sheet insulation used inside the enclosure.
See below.
P
Basic or supplementary insulation, at least two
layers, each meeting 10.3 dielectric
layers, each meeting 10.3 dielectric
N/A
Basic or supplementary insulation, three layers any
two of which meet 10.3 dielectric
two of which meet 10.3 dielectric
N/A
Reinforced insulation, two layers each of which
meet 10.3 dielectric
meet 10.3 dielectric
Two layers of insulation tapes are used
for T1, primary heat sink and secondary
heat sink.
for T1, primary heat sink and secondary
heat sink.
Each one layer meets electric strength of
10.3.
10.3.
P
Reinforced insulation, three layers any two which
meet 10.3 dielectric
meet 10.3 dielectric
N/A
8.9
Primary Wiring: Adequate insulation between
internal hazardous live conductors and accessible
parts
internal hazardous live conductors and accessible
parts
Adequate insulation between primary
circuits and accessible parts.
circuits and accessible parts.
P
Secondary Wiring: Adequate insulation between
internal hazardous live parts and conductors
connected to accessible parts
internal hazardous live parts and conductors
connected to accessible parts
Adequate insulation between internal
hazardous live parts and secondary
internal wire.
hazardous live parts and secondary
internal wire.
P
8.10
Class II Wiring:
(1) Primary: Double insulation between conductors
connected to the mains and accessible parts.
connected to the mains and accessible parts.
(2) Secondary: Double insulation between
conductors connected to accessible parts and the
mains
conductors connected to accessible parts and the
mains
See above.
P
8.11
Detaching of wires
The wires are inserted into a hole in
PCB before soldering.
PCB before soldering.
There’s no risk of a wire becoming
detached in the sense of this standard.
detached in the sense of this standard.
P
No undue reduction of creepages or clearance
distances if wires become detached
distances if wires become detached
The wires in secondary side are fixed
with double methods, there’s no risk of a
wire becoming detached.
with double methods, there’s no risk of a
wire becoming detached.
P
Vibration test carried out ......................................... : Vibration test is carries out according to
clause 12.1.2.
P
Click on the first or last page to see other ON TIME 200ID (serv.man2) service manuals if exist.