ON STAGEII (serv.man3) - JBL Audio EMC - CB Certificate (repair manual)

on stageii (serv.man3) emc - cb certificate
Model
ON STAGEII (serv.man3)
Pages
72
Size
1.72 MB
Type
PDF
Document
EMC - CB Certificate
Brand
Device
Audio
File
on-stageii-sm3.pdf
Date

Read JBL ON STAGEII (serv.man3) EMC - CB Certificate online

Nemko USA, Inc. 
11696 Sorrento Valley Rd., Suite F 
San Diego, CA 92121-1024 
Phone (858) 755-5525   Fax (858) 452-1810 
 
EMC
 
D
IRECTIVE 
89/336/EEC 
 
 
 
CE
 
E
VALUATION
 
 
T
EST 
R
EPORT
 
 
PER 
EN
 
55022
 AND 
EN
 
55024 
 
For The
 
Computer Speaker System 
Model: 
OnStage UD
 
 
 
 
 
 
P
REPARED FOR
 
Harman Multimedia 
8500 Balboa Blvd. 
Northridge, CA  91329 
 
 
 
 
 
 
 
P
REPARED ON 
Janurary 5,2006 
 
R
EPORT 
N
UMBER 
2006 011114 CE AUS/NZ 
 
 
PROJECT NUMBER:  25-1114-HAR 
 
 
Nemko USA, Inc. 
11696 Sorrento Valley Road, Suite F, San Diego, CA  92121 
Phone (858) 755-5525  Fax (858) 452-1810 
DATE 
DOCUMENT NAME 
DOCUMENT # 
PAGE 
Janurary 5,2006 
Harman Multimedia  OnStage UD    CE Test Report 
2006 011114 CE AUS/NZ 
 
2 of 72 
 
 
DOCUMENT HISTORY 
 
REVISION DATE 
COMMENTS 
Janurary
 5,2006
 
Prepared By:  
Rodel Resolme 
Janurary
 5,2006
 
Initial Release: 
Chip Fluery 
 
NOTE:  Nemko USA, Inc. hereby makes the following statements so as to conform to Chapter 10 (Test 
Reports) Requirements of ANSI C63.4 (1992) “Methods and Measurement of Radio-Noise Emissions from 
Low-Voltage Electrical and Electronic Equipment in the Range of 9 kHz to 40 GHz”: 
 
o
  The unit described in this report was received at Nemko USA, Inc.'s facilities on  January 3, 
2005 .  
o
  The Test Results reported herein apply only to the Unit actually tested, and to substantially 
identical Units. 
o
  This report does not imply the endorsement of the Federal Communications Commission (FCC), 
NVLAP or any other government agency. 
 
This Report is the property of Nemko USA, Inc., and shall not be reproduced, except in full, without prior 
written approval of Nemko USA, Inc.  However, all ownership rights are hereby returned unconditionally to 
Harman Multimedia, and approval is hereby granted to Harman Multimedia and its employees and agents 
to reproduce all or part of this report for any legitimate business purpose without further reference to Nemko 
USA, Inc. 
 
Nemko USA, Inc. 
11696 Sorrento Valley Road, Suite F, San Diego, CA  92121 
Phone (858) 755-5525  Fax (858) 452-1810 
DATE 
DOCUMENT NAME 
DOCUMENT # 
PAGE 
Janurary 5,2006 
Harman Multimedia  OnStage UD    CE Test Report 
2006 011114 CE AUS/NZ 
 
3 of 72 
 
TABLE OF CONTENTS 
DOCUMENT HISTORY .................................................................................................................................. 2
 
CERTIFICATION ............................................................................................................................................. 5
 
1.
 
ADMINISTRATIVE DATA AND TEST SUMMARY ......................................................................... 6
 
1.1.A
DMINISTRATIVE 
D
ATA
.................................................................................................................................. 6
 
1.2.T
EST 
S
UMMARY
.............................................................................................................................................. 7
 
2.
 
SYSTEM CONFIGURATION ................................................................................................................ 9
 
2.1.S
YSTEM 
C
OMPONENTS AND 
P
OWER 
C
ABLES
.................................................................................................. 9
 
2.2.D
EVICE 
I
NTERCONNECTION AND 
I/O
 
C
ABLES
................................................................................................. 9
 
2.3.D
ESCRIPTION AND 
M
ETHOD OF 
E
XERCISING THE 
EUT ................................................................................. 10
 
2.4.D
ESIGN 
M
ODIFICATIONS FOR 
C
OMPLIANCE
.................................................................................................. 10
 
3.
 
DESCRIPTION OF TESTING METHODS ........................................................................................ 11
 
3.1.I
NTRODUCTION
............................................................................................................................................. 11
 
3.2.C
ONFIGURATION AND 
M
ETHODS OF 
M
EASUREMENTS FOR 
C
ONDUCTED 
E
MISSIONS
..................................... 16
 
3.3.C
ONFIGURATION AND 
M
ETHODS OF 
M
EASUREMENTS FOR 
F
REQUENCY 
I
DENTIFICATION
............................. 18
 
3.4.C
ONFIGURATION AND 
M
ETHODS OF 
M
EASUREMENTS FOR 
R
ADIATED 
E
MISSIONS
........................................ 20
 
3.5.S
TATISTICAL 
S
AMPLING 
R
EQUIRED FOR 
C
ONTINUED 
C
OMPLIANCE
.............................................................. 22
 
3.6.P
OWER 
L
INE 
H
ARMONICS
:
 
EN
 
61000-3-2
 
(2000),
 
A1(2001),
 
A2(2005) ...................................................... 22
 
3.7.P
OWER 
L
INE 
F
LUCTUATIONS
/F
LICKER
:
 
EN
 
61000-3-3
 
(1995),
 
A1(2001) .................................................... 23
 
3.8.D
EVICE 
P
ERFORMANCE 
C
RITERIA FOR 
I
MMUNITY 
T
ESTS
.............................................................................. 25
 
3.9.E
LECTROSTATIC 
D
ISCHARGE 
I
MMUNITY
:
 
IEC
 
61000-4-2
 
(2001) ................................................................. 26
 
3.10.R
ADIO 
F
REQUENCY 
I
MMUNITY
:
 
IEC
 
61000-4-3
 
(2002) .............................................................................. 28
 
3.11.E
LECTRICAL 
F
AST 
T
RANSIENT 
I
MMUNITY
:
 
IEC
 
61000-4-4
 
(2004) ............................................................. 30
 
3.12.P
OWER 
L
INE 
S
URGE 
I
MMUNITY
:
 
IEC
 
61000-4-5
 
(2001) ............................................................................. 32
 
3.13.R
ADIO 
F
REQUENCY 
C
ONDUCTED 
C
OMMON 
M
ODE 
I
MMUNITY
:
 
IEC
 
61000-4-6
 
(2004) .............................. 34
 
3.14.P
OWER 
F
REQUENCY 
M
AGNETIC 
F
IELD 
I
MMUNITY
:
 
IEC
 
61000-4-8
 
(2001)................................................. 36
 
3.15.V
OLTAGE 
D
IPS AND 
S
HORT 
I
NTERRUPTIONS
:
 
IEC
 
61000-4-11(2004) ........................................................ 38
 
4.
 
TEST RESULTS ..................................................................................................................................... 40
 
4.1.C
ONDUCTED 
E
MISSIONS 
T
EST 
D
ATA
............................................................................................................ 40
 
4.2.R
ADIATED 
E
MISSIONS 
T
EST 
D
ATA
................................................................................................................ 43
 
4.3.E
LECTROSTATIC 
D
ISCHARGE 
I
MMUNITY 
T
EST 
R
ESULTS 
&
 
T
EST 
P
OINTS
...................................................... 45
 
4.4.R
ADIO 
F
REQUENCY 
I
MMUNITY 
T
EST 
R
ESULTS
............................................................................................. 47
 
4.5.E
LECTRICAL 
F
AST 
T
RANSIENT 
B
URST 
I
MMUNITY 
T
EST 
R
ESULTS
................................................................. 49
 
4.6.P
OWER 
L
INE 
S
URGE 
I
MMUNITY 
T
EST 
R
ESULTS
............................................................................................ 50
 
4.7.RF
 
C
ONDUCTED 
C
OMMON 
M
ODE 
D
ISTURBANCE 
I
MMUNITY 
T
EST 
R
ESULTS
................................................ 51
 
4.8.V
OLTAGE 
D
IPS AND 
I
NTERRUPTIONS 
I
MMUNITY 
T
EST 
R
ESULTS
................................................................... 52
 
TEST SETUP DIAGRAMS 
Figure 1.   General EUT Test Setup Diagram ....................................................................................................13
 
Figure 2.  Conducted Emissions Test Setup Diagram........................................................................................17
 
Figure 3.   Frequency ID of Radiated Emissions Test Setup Diagram...............................................................19
 
Nemko USA, Inc. 
11696 Sorrento Valley Road, Suite F, San Diego, CA  92121 
Phone (858) 755-5525  Fax (858) 452-1810 
DATE 
DOCUMENT NAME 
DOCUMENT # 
PAGE 
Janurary 5,2006 
Harman Multimedia  OnStage UD    CE Test Report 
2006 011114 CE AUS/NZ 
 
4 of 72 
 
Figure 4.   Radiated Emissions Test Setup Diagram..........................................................................................21
 
Figure 5.   Harmonics & Flicker Test Setup Diagram........................................................................................24
 
Figure 6.   ESD Test Setup Diagram..................................................................................................................27
 
Figure 7.   Radio Frequency Immunity Test Setup Diagram .............................................................................29
 
Figure 8.   EFT Immunity Test Setup Diagram..................................................................................................31
 
Figure 9.   Power Line Surge Immunity Test Setup Diagram ............................................................................33
 
Figure 10.   RF Common Mode Immunity Test Setup Diagram........................................................................35
 
Figure 11.  Power Frequency Magnetic Field Immunity Test Setup .................................................................37
 
Figure 12.  Voltage Dips and Short Interruptions Test Setup Diagram .............................................................39
 
Figure 13.  ESD Test Points...............................................................................................................................46
 
TEST CONFIGURATION PHOTOGRAPHS 
Photograph 1.  General EUT Test Configuration...............................................................................................12
 
Photograph 2.  Conducted Emissions Test Configuration .................................................................................53
 
Photograph 3.  Radiated Emissions Test Configuration ....................................................................................54
 
Photograph 4.  ESD Test Configuration ............................................................................................................55
 
Photograph 5.  Radio Frequency Immunity Test Configuration ........................................................................56
 
Photograph 6.  EFT Immunity Test Configuration ............................................................................................57
 
Photograph 7.  Power Line Surge Immunity Test Configuration.......................................................................58
 
Photograph 8.  RF Common Mode Immunity Test Configuration ....................................................................59
 
Photograph 9.  Voltage Dips/Short Interruptions Test Configuration; Powerline Harmonics and Flicker Test 
Configuration .............................................................................................................................................60
 
APPENDICES 
A.
 
C
ONDUCTED 
&
 
R
ADIATED 
E
MISSIONS 
M
EASUREMENT 
U
NCERTAINTIES
........................................................ 61
 
B.
 
N
EMKO 
USA,
 
I
NC
.’
T
EST 
E
QUIPMENT 
&
 
F
ACILITIES 
C
ALIBRATION 
P
ROGRAM
............................................ 63
 
C.
 
NVLAP
 
A
CCREDITATION 
/
 
N
EMKO 
A
UTHORIZATION
..................................................................................... 65
 
Page of 72
Display

Download JBL ON STAGEII (serv.man3) EMC - CB Certificate

Here you can read online and download JBL ON STAGEII (serv.man3) EMC - CB Certificate in PDF. ON STAGEII (serv.man3) emc - cb certificate will guide through the process and help you recover, restore, fix, disassemble and repair JBL ON STAGEII (serv.man3) Audio. Information contained in service manuals typically includes schematics / circuit diagrams, wiring diagrams, block diagrams, printed wiring boards, exploded views, parts list, disassembly / assembly, pcb.