ON STAGE III IIIP (serv.man7) - JBL Audio EMC - CB Certificate (repair manual). Page 40

Read JBL ON STAGE III IIIP (serv.man7) EMC - CB Certificate online

   
                                   Audix Technology (Shenzhen) Co., Ltd. Report No. ACS-E07439      page 40 of 66 
 
 
11.4.Severity Levels and Performance Criterion 
11.4.1.Severity level 
Severity Level 
Open-Circuit Test Voltage 
kV 




0.5 
1.0 
2.0 
4.0 
Special 
11.4.2.Performance criterion : B 
11.5.EUT Configuration 
The configuration of EUT are listed in Section 3.5. 
11.6.Operating Condition of EUT 
Same as Conducted Emission test which is listed in Section 3.6. except the test set up 
replaced by Section 11.2. 
11.7.Test Procedure 
1)  Set up the EUT and test generator as shown on Section 11.2.2. 
2)  For line to line coupling mode, provide a 1kV 1.2/50us voltage surge (at       
open-circuit condition) and 8/20us current surge to EUT selected points, and for 
active line / neutral line to ground are same except test level is 2kV. 
3)  At least 5 positive and 5 negative (polarity) tests with a maximum 1/min     
repetition rate are applied during test. 
4)  Different phase angles are done individually. 
5)  Record the EUT operating situation during compliance test and decide the EUT   
immunity criterion for above each test. 
11.8.Test Results 
PASS. 
 
The EUT was tested and all the test results are listed in next page. 
Page of 66
Display

Click on the first or last page to see other ON STAGE III IIIP (serv.man7) service manuals if exist.