ON BEAT - JBL Audio EMC - CB Certificate (repair manual). Page 2

Read JBL ON BEAT EMC - CB Certificate online

Page 1 of 39
TRF No.: IEC/EN60950_1c
Test Report issued under the responsibility of:
NCB
TÜV SÜD PSB Pte Ltd.
No. 1 Science Park Drive.
118221 Singapore
TEST REPORT
IEC 60950-1: 2005 (2nd Edition) and/or EN 60950-1:2006
Information technology equipment – Safety –
Part 1: General requirements
Report Reference No. ................... :
086-2101101501-000
Date of issue ................................... :  2011-02-16
Total number of pages .....................   39
CB Testing Laboratory ................. :
TÜV SÜD Hong Kong Ltd.
Address .......................................... :  3/F., West Wing, Lakeside 2, 10 Science Park West Avenue,
Science Park, Shatin, Hong Kong.
Applicant’s name .......................... :
Harman Technology (Shenzhen) Co., Ltd.
12th Road South, Hi-tech Industrial Park Shenzhen China.
Manufacturer’s name .................... :
Harman Consumer, Inc.
Factory’s name ............................. :
Guoguang Electric Co., Ltd.
Address .......................................... :  No.8 Jinghu Road, Xinhua Town, Huadu Reg, Guangzhou, China
510800.
Test specification:
Standard ......................................... :
 IEC 60950-1:2005 (2nd Edition) and
 EN 60950-1:2006
Test procedure ................................ :  CB-Scheme  & GS-Mark
Non-standard test method…………..:  N/A
Test Report Form No. ................... :
IECEN60950_1C
Test Report Form(s) Originator ....... :
SGS Fimko Ltd
Master  TRF ..................................... :
Dated 2007-06
This publication may be reproduced in whole or in part for non-commercial purposes as long as the IECEE is acknowledged as copyright
owner and source of the material. IECEE takes no responsibility for and will not assume liability for damages resulting from the reader's
interpretation of the reproduced material due to its placement and context.
If this Test Report Form is used by non-IECEE members, the IECEE/IEC logo and the reference to the CB Scheme
procedure shall be removed.
This report is not valid as a CB Test Report unless signed by an approved CB Testing Laboratory and appended to a CB Test
Certificate issued by an NCB in accordance with IECEE 02.
Page of 82
Display

Click on the first or last page to see other ON BEAT service manuals if exist.