AV1 (serv.man2) - JBL Audio EMC - CB Certificate (repair manual). Page 13

Read JBL AV1 (serv.man2) EMC - CB Certificate online

Report #70112.e1 
37-1 Ayer Road 
 Littleton, MA 01460 
Page 13 of 27 
Tel: (978) 486-043 
Fax: (978) 486-0592 
www.entela.com 
 
 
3.2 Conducted 
Emissions 
 
3.2.1 Object 
The purpose of this test is to measure the conducted electromagnetic emissions on the AC power 
lines, pursuant to FCC part 15 and EN55022 Class B requirements. (See Table 3.2.1-1 for the 
Class B conducted limits.) 
 
3.2.2 Procedure
 
Testing is performed in an Open Area Test Site. Equipment is arranged on the table as described 
in section 3.1.2. Each individual current-carrying power lead shall be individually connected 
through a 50
Ω/50µH Line Impedance Stabilization Network (LISN). A 2-meter x 2-meter vertical 
coupling plane is placed 40 cm to the rear of the EUT. The EUT is set into operation such that all 
parts of the system are exercised, while the RF voltages across the 50 
Ω measuring port of the 
LISN are recorded. The test is repeated for each current-carrying power line of the EUT. 
 
3.2.3  Deviations from Test Method
 
None 
 
3.2.4 Measurement 
Uncertainty 
A minimum of a 1 dB margin of compliance is recommended for conducted emissions data to 
verify passing results. This is recommended to compensate for the measurement uncertainties 
involved. 
Page of 27