9 Remove the compressor and heat charger tank.
o
Cut the bands (2 locations) which fix the compressor to the heat charger tank.
o
Remove the clamp and separate the compressor and heat charger tank.
Note on disassembly: Remove the heat charger tank sensor when replacing the heat charger tank.
16.2.8 Heat Charger () Replacement Procedure
16.2.8.1 Preparation
1 Power-off the unit (remove plug and/or etc.,).
2 Collect all refrigerant into the cylinder by reclaiming machine.
3 As brazing work is involved, make sure the workshop and surrounding area is sufficient and safe.
2 Collect all refrigerant into the cylinder by reclaiming machine.
3 As brazing work is involved, make sure the workshop and surrounding area is sufficient and safe.
16.2.8.2 Process
1
(Dismantling of the Parts)
1 Remove control-board cover, top plate and front panel, pull out connecting wire, then remove side panel
(right).
2 Disconnect all connectors connected to control board.
3 Remove solenoid coils of 2-way, 4-way and expansion valves.
4 Disconnect of compressor connector, and remove control board.
3 Remove solenoid coils of 2-way, 4-way and expansion valves.
4 Disconnect of compressor connector, and remove control board.
Heat charger: Part description is heat charge.
Click on the first or last page to see other CS-VE9NKE / CS-VE12NKE / CU-VE9NKE / CU-VE12NKE service manuals if exist.