Read JBL SB 200 (serv.man3) EMC - CB Certificate online
Page 8 of 70
Report No.: 350-120155AX
IEC 60065
Clause
Requirement + Test
Result - Remark
Verdict
TRF No. IEC60065K
7.2
Softening temperature of insulating material
supporting parts conductively connected to the
mains carrying a current > 0,2 A at least 150
supporting parts conductively connected to the
mains carrying a current > 0,2 A at least 150
o
C
PCB supporting primary
connector.
connector.
Pass
8
Constructional requirements with regard to the protection against electric
shock
shock
-
8.1
Conductive parts covered by lacquer, paper,
untreated textile oxide films and beads etc.
considered to be bare
untreated textile oxide films and beads etc.
considered to be bare
N/A
8.2
No shock hazard when changing voltage setting
device, fuse-links or handling drawers etc.
device, fuse-links or handling drawers etc.
Not done without a tool.
Pass
8.3
Insulation of hazardous live parts not provided by
hygroscopic material
hygroscopic material
No hygroscopic material used.
Pass
8.4
No risk of electric shock from accessible parts or
from parts rendered accessible following the
removal of a cover which can be removed by hand
from parts rendered accessible following the
removal of a cover which can be removed by hand
See CL. 8.6.
Pass
8.5
Class I equipment
N/A
Basic insulation between hazardous live parts and
earthed accessible parts
earthed accessible parts
N/A
Resistors bridging basic insulation complying with
14.1 a)
14.1 a)
N/A
Capacitors bridging basic insulation complying with
14.2.1 a)
14.2.1 a)
N/A
Protective earthing terminal
N/A
8.6
Class II equipment and Class II constructions within
Class I equipment
Class I equipment
Refer to below.
Pass
Double or reinforced insulation between hazardous
live parts and accessible parts
live parts and accessible parts
See appended table of CL.13.
Pass
Components bridging double or reinforced insulation
complying with 14.1 a) or 14.3
complying with 14.1 a) or 14.3
See appended Table of CL.14,
Transformer complied with
CL.14.3.
Transformer complied with
CL.14.3.
Pass
Basic insulation bridged by components complying
with 14.3.4.3.
with 14.3.4.3.
No such components.
N/A
Basic and supplementary insulation each being
bridged by a capacitor complying with 14.1 a)
bridged by a capacitor complying with 14.1 a)
No such components.
N/A
Double or reinforced insulation being bridged with 2
capacitors in series complying with 14.2.1 a)
capacitors in series complying with 14.2.1 a)
N/A
Double or reinforced insulation being bridged with a
single capacitor complying with 14.2.1 b)
single capacitor complying with 14.2.1 b)
See appended Table of CL.14,
Y1 cap. (CY501, CY502,
CY506).
Y1 cap. (CY501, CY502,
CY506).
Pass
8.7
This clause is void
—
8.8
Basic or supplementary insulation > 0,4 mm (mm) :
N/A
Reinforced insulation > 0,4 mm (mm) ....................: See appended Table of CL.8.8
and 8.9.
Pass
Click on the first or last page to see other SB 200 (serv.man3) service manuals if exist.