Read Sony JMECHA Service Manual online
— 32 —
4-1. Adjustment Preparation
1)
Clean the tape running surface (tape guides, drum, capstan,
pinch roller) referring to Service Manual.
pinch roller) referring to Service Manual.
2)
Connect adjustment remote commander (Ref. No. J-13) to the
LANC terminal of the machine. Set the HOLD switch to ON.
LANC terminal of the machine. Set the HOLD switch to ON.
3)
Connect an oscilloscope to the VC-240 board CN009 via the
CPC-8 jig (J-082-388-A). (in the case of DCR-TRV20).
Scope channel 1: VC-240 board CN009 pin w; (Note)
External trigger:
CPC-8 jig (J-082-388-A). (in the case of DCR-TRV20).
Scope channel 1: VC-240 board CN009 pin w; (Note)
External trigger:
VC-240 board CN009 pin qj
Note:
Connect CN009 pin w; and pin ql (GND) with 75
Ω
resistor
(1-247-804-11).
4)
Play the tracking alignment tape (XH2-1)(Ref. No. J-5) back.
5)
Select page: 3, address: 33 and data: 08. (Note)
6)
Select page: 3, address: 26 and data: 31. (Note)
7)
Confirm that RF waveform on scope is flat in both entrance
side and exit side. (Refer to Fig. 4-2 A).
If RF waveform is not flat in entrance side and exit side, perform
the adjustment of section 4-2. and later. (Refer to Fig. 4-2 B
and C).
side and exit side. (Refer to Fig. 4-2 A).
If RF waveform is not flat in entrance side and exit side, perform
the adjustment of section 4-2. and later. (Refer to Fig. 4-2 B
and C).
8)
When the required conditions of step 7) are satisfied and
adjustment/check are complete, perform [Required work upon
completion of adjustment] as described below.
adjustment/check are complete, perform [Required work upon
completion of adjustment] as described below.
[Required work upon completion of adjustment]
1)
1)
Connect adjustment remote commander (Ref. No. J-13) to the
LANC terminal of the machine. Set the HOLD switch to ON.
LANC terminal of the machine. Set the HOLD switch to ON.
2)
Select page: 3, address: 26 and data: 00. (Note)
3)
Select page: 3, address: 33 and data: 00. (Note)
Note:
Page and address numbers differ depending on each model. Please
refer to Service Manual of respective models. Those of DCR-TRV20
are described above.
refer to Service Manual of respective models. Those of DCR-TRV20
are described above.
4. Tape Path Adjustment
Fig. 4-1
CH1
CH2
(Trigger)
(Trigger)
Envelope
must be flat
must be flat
3.3 msec
Fig. 4-2
A
Normal
B
Entrance side is defective
C
Exit side is defective
Entrance side
Exit side
Fig. 4-3
T-reel
Pinch roller
Capstan
Capstan
TG7 guide
TG6 guide
FWD
TG3 guide
TG2 guide
TG1 guide
TG1
TG3 TG4
TG5 TG6
TG7
TG2
TG3 and TG4 zenith
adjustment screw
adjustment screw
Tape runs while keeping
contact with upper flange
contact with upper flange
Tape runs while keeping
contact with upper flange
contact with upper flange
TG4 guide
TG5 guide
TG6 guide zenith
adjustment screw
adjustment screw
S-reel
Drum
Tape
Click on the first or last page to see other JMECHA service manuals if exist.