Read Sony KV-LS212M90 Service Manual online
– 9 –
KV-LS212M90
RM-GA002
2-6. Earth Coating Assy installation at CRT
2-7. Caution for chassis docking process
2-8. DGC Connector, Lead Assy, Speaker and Lead Assy, Earth dressing
Make sure the round side
of spring tension is
installed to Earth Assy,
Coating
of spring tension is
installed to Earth Assy,
Coating
Earth Assy,
Coating
Ensure wire is not trapped
between bottom cover's rib
& PWB while docking chassis.
between bottom cover's rib
& PWB while docking chassis.
Ensure wire does not
go underneath PWB
while docking chassis.
go underneath PWB
while docking chassis.
Ensure wire is not
scratched by residue
(sharp edge)
scratched by residue
(sharp edge)
OK
NG
Pin Lead
CRT Support
Note *: Wiredressing done during chassis half way docked unto beznet.
CAUTION:
1. Dress speaker wires above capacitors near it --> prevent from touching high-temp parts.
1. Dress speaker wires above capacitors near it --> prevent from touching high-temp parts.
Standing Purse Lock
Dress AC Power Cord and Lead Assy,
Speaker (WHT+BLK) with Pin, wire A016
Make sure Lead Assy,
Earth is kept away from group of heatsinks
Dress DGC Conn together with AC Power Cord, Lead Assy, Earth & Lead Assy,
Speaker (RED+BLK) which are dressed during Chassis Assy as shown in 2-5
Dress wires away from beznet's front terminal --> Prevent wires from being
sandwiched when docking chassis.
DGC Conn
Lead Assy,
Speaker (RED+BLK)
AC Power Cord
Lead Assy, Earth
Standing Purse
Lock