KDL-32BX330, KDL-32BX331 - Sony TV Service Manual (repair manual). Page 6

Read Sony KDL-32BX330 / KDL-32BX331 Service Manual online

6
KDL-32BX330/32BX331
KDL-32BX330/32BX331
SAFETY CHECK-OUT
After correcting the original service problem, perform the 
following safety checks before releasing the set to the 
customer:
1)  Check the area of your repair for unsoldered 
or poorly soldered connections. Check the 
entire board surface for solder splashes and 
bridges.
2)  Check the interboard wiring to ensure that no 
wires are “pinched” or touching high-wattage 
resistors.
3)  Check that all control knobs, shields, covers, 
ground straps, and mounting hardware have 
been replaced. Be absolutely certain that you 
have replaced all the insulators.
4)  Look for unauthorized replacement parts, 
particularly transistors, that were installed 
during a previous repair. Point them out 
to the customer and recommend their 
replacement.
5)  Look for parts which, though functioning, 
show obvious signs of deterioration. Point 
them out to the customer and recommend 
their replacement.
6)  Check the line cords for cracks and abrasion. 
Recommend the replacement of any such 
line cord to the customer.
7)  Check the antenna terminals, metal trim, 
“metallized” knobs, screws, and all other 
exposed metal parts for AC leakage. Check 
leakage as described in “Leakage Test”.
LEAKAGE TEST
The AC leakage from any exposed metal part to earth 
ground and from all exposed metal parts to any exposed 
metal part having a return to chassis, must not exceed 
0.5 mA (500 microamperes). Leakage current can be 
measured by any one of three methods.
1.  A commercial leakage tester. Follow the 
manufacturers’ instructions provided with the 
tester.
2.  A battery-operated AC milliammeter. 
3.  Measuring the voltage drop across a resistor 
by means of a VOM or battery-operated AC 
voltmeter. The “limit” indication is 0.75 V, so 
analog meters must have an accurate low 
voltage scale. Nearly all battery-operated 
digital multimeters that have a 2 VAC range 
are suitable. (see Figure A)
To Exposed Metal
Parts on Set
0.15 µF
Earth Ground
AC
Voltmeter
(0.75V)
Figure A. Use an AC voltmeter to check AC leakage.
HOW TO FIND A GOOD EARTH GROUND
The cover-plate retaining screw on most AC outlet boxes 
is at earth ground. Verify the AC outlet box retaining screw 
ground by connecting a 60W to 100W incandescent (not 
a neon lamp or fluorescent lamp) between the hot side 
of the receptacle and the retaining screw. Try both slots, 
if necessary, to locate the hot side on the line; the lamp 
should light at normal brilliance if the screw is at ground 
potential. (see Figure B)
Figure B. Checking for earth ground.
Trouble Light
AC Outlet Box
Page of 40
Display

Click on the first or last page to see other KDL-32BX330 / KDL-32BX331 service manuals if exist.