Figure 4-24.
Replacement
1. Solder the removed PWB to the new head assembly.
2. Adjust the height from the A/C head plate (lower surface)
to the A/C head base  to 10.8mm with slide calipers. (3
places of azimuth screw section, tilt screw section and
height screw section) (See the figure below.)
3. Align the left end of gear of A/C head plate with the
punched mark of chassis, tentatively tighten the screws
plate 
1
 and 
2
 so as to ensure smooth motion of A/C
head plate. Tentative tightening torque must be 0.15 to
0.20 N·m (1.5 to 2.0kgf·cm).
REPLACEMENT OF A/C (Audio/Control) HEAD
1. Remove the cassette housing control assembly.
2. In unloading state unplug the power cord.
• Removal
1. Remove the screws 
123
, Azimuth screw, Tilt screw.
2. Unsolder the PWB fitted to the A/C head.
Notes:
1. When replacing, never touch the head. If you touched,
clean with the cleaning liquid.
2. When removing the screw 
3
, take care so that the
spring may spring out.
A/C head PWB
2
Spring
1
Solder
10.8mm
10.8mm
Azimuth screw
Height screw
Tilt  screw
A/C head base
Figure 4-25.
Note:
1. If the screws 
1
 and 
2
 are tighten tentatively too loose,
the azimuth and height of A/C head may change when
they are finally tightened. Therefore care must be taken.
2. After completion of A/C head be sure to adjust tape
running. (Execute the running adjustment by the method
described in Page 20, 21.)
Punched line mark on chassis
Left end of A/C head plate gear
1
2
3
Height screw
Figure 4-23.
3
Never touch the head
New A/C head ass'y
Page of 19