XG-V10WE (serv.man8). Service Manual text - Page 1-59 - Sharp Projector Service Manual (repair manual). Page 16

Read Sharp XG-V10WE (serv.man8) Service Manual online

16
XG-V10WE
AN-SD1E/S422E
3. Removing the reinforcing angles and intake fan duct assembly.
3-1. Remove the four lock screws from the front reinforcing angle and detach this angle.
3-2. Remove the four lock screws from the rear reinforcing angle and detach this angle.
3-3. Remove the five lock screws from the intake fan duct assembly and detach this assembly.
3-4. Remove the two lock screws from the intake cover and detach this cover.
3-2
3-1
3-1
3-2
3-2
3-4
3-3
3-3
3-3
Front reinforcing angle
Rear reinforcing angle
Intake cover
Intake fan duct assembly
Page of 59
Display

Click on the first or last page to see other XG-V10WE (serv.man8) service manuals if exist.