Read Sharp MX-RB12 (serv.man4) Service Manual online
MX-7040N MX-RB13 (RELAY UNIT) 18 – 1
MX-7040N
Service Manual
[18] MX-RB13 (RELAY UNIT)
1. Unpacking
A. Relay unit unpacking
NOTE: When moving the relay unit, use manpower of two or more
persons.
B. Fixing tape and protection material removal
1)
Remove the fixing tape and fixing bracket from the relay unit.
C. Packed items check
D. Cushion attachment
2. Installation
NOTE: Before installation, be sure to turn both the operation and
main power switches off and disconnect the power plug
from the power outlet. Make double sure that the data lamp
on the operation panel does not light up or blink when per-
forming installation.
from the power outlet. Make double sure that the data lamp
on the operation panel does not light up or blink when per-
forming installation.
NOTE: To prevent against falling during installation, extend the
stand rail.
A. Shunt cable connection plate installation
(Back of the relay unit)
1)
Fix the shunt cable connection plate (Packed items No.7) with
the screws (Packed items No.2).
the screws (Packed items No.2).
No.
Name
Quantity
1
Screw (M3 x 6 RS tight)
6
2
Screw (M4 x 8 RS tight)
8
3
Screw (M4 x 7 Round tup)
2
4
Latch receiver F
1
5
Latch receiver R
1
6
Earth bracket
1
7
Shunt cable connection plate
1
8
Rear upper cover
1
9
Paper guide D
1
10
Top surface cushion
1
1
2
3
4
5
6
7
8
9
10
Cushion attachment
position
position
Reference of cushion on.
(Rear screw hole tiered edge)
(Rear screw hole tiered edge)
Reference of cushion on.
(Upper cabinet lower edge)
(Upper cabinet lower edge)
Click on the first or last page to see other MX-RB12 (serv.man4) service manuals if exist.