MX-M623U, MX-M753U (serv.man7). INSTALLATION MANUAL. - Sharp Copying Equipment Service Manual (repair manual). Page 100

Read Sharp MX-M623U / MX-M753U (serv.man7) Service Manual online

MX-M753N  DRY HEATER INSTALLATION  24 – 3
4)
Fix the harness with the snap band, and pass it through the
edge saddle.
5)
Connect the connector to the dehumidify8ing heater relay
PWB.
4.  Dry heater (paper feed trays 3, 4) 
installation
1)
Open the left under cabinet.
2)
Remove the connector cover.
3)
Disconnect the connector.
4)
Remove the lower stage of the paper trays 3/4 paper feed unit.
5)
Remove the paper feed lower cover.
No.
Part name
Part code
Q'ty
1
Heater mounting plate
LPLTM6021FCZZ
1
2
Edge saddle (EH11)
LHLDW1285FCZZ
1
3
Heater radiating fin
PRDAR0087FCZZ
1
4
Dry heater (120V) 
(Paper feed trays 3, 4)
RHETP0117FCZZ
1
Dry heater (230V) 
(Paper feed trays 3, 4)
RHETP0122FCZZ
5
Screw (M3 x 4)
XHBSE30P04000
4
6
Screw (M3 x 6)
XHBSD30P06000
2
Page of 104
Display

Click on the first or last page to see other MX-M623U / MX-M753U (serv.man7) service manuals if exist.