Read Sharp MX-GB50A (serv.man3) Service Manual online
6
TEST OPERATION
Check to ensure that the paper chip tray is securely in place.
Check to ensure that a Die Set is installed properly and that any extra Die Sets are securely
stored in the Die Storage Area.
stored in the Die Storage Area.
Run a small test job in “Bypass” mode. Check to ensure that the job is not punched and
bypasses properly.
bypasses properly.
Run a small job with Punch Enabled. Check the punched holes of the job.
GBC SMARTPUNCH INSTALLATION AND SET-UP
REFERENCE ILLUSTRATION – FOR MT-C3 & VC-1 ONLY
GBC SMARTPUNCH INSTALLATION AND SET-UP
REFERENCE ILLUSTRATION - FOR BC-3
Input Guide
1
GBC Streampunch
Interconnect
Communication
Cable
To Streampunch
To Printer
Secure IC
bracket w/
wire tie-wrap
GBC SmartPunch
Interconnect
Communication
Cable
To SmartPunch
GBC
SmartPunch
Interconnect
Interconnect
Communication
Cable
To SmartPunch
Click on the first or last page to see other MX-GB50A (serv.man3) service manuals if exist.