MX-7090N, MX-8090N (serv.man3). Installation Manual. - Sharp Copying Equipment Service Manual (repair manual). Page 13

Read Sharp MX-7090N / MX-8090N (serv.man3) Service Manual online

MX-8090N  MX-7090N/8090N (MAIN UNIT)  2 – 4
3) Install  the  Panel  (Packed  item  No.5)  by  fixing  the  screws
(Packed item No.14).
4) Arrange the wire and fix the screw as the figure below.
NOTE:
Handle the connectors with care not to make damage
to the connector when connecting.
NOTE:
Connect the connectors vertically to the PWB.
NOTE:
When arranging the cable, never twist it.
NOTE:
Handle the connectors with care not to make damage
to the connector by snagging them when wiring.
5) Install the Arm cover B (Packed item No.6) by fixing the screws
(Packed item No.14).
6) Install the Upper arm cover B (Packed item No.7) by fixing the
screws (Packed item No.14).
7) Install  the  Arm  cover  A  by  fixing  the  screws  (Packed  item
No.14).
8) Turn the operation panel to make the cabinet line straight and
Install the Arm cover R (Packed item No.8) as the figure below.
Page of 127
Display

Click on the first or last page to see other MX-7090N / MX-8090N (serv.man3) service manuals if exist.