MX-5050N, MX-5050V, MX-5070N, MX-5070V, MX-6050N, MX-6050V, MX-6070N, MX-6070V (serv.man7). Installation Manual (Revised May 2017). - Sharp Copying Equipment Service Manual (repair manual). Page 11

Read Sharp MX-5050N / MX-5050V / MX-5070N / MX-5070V / MX-6050N / MX-6050V / MX-6070N / MX-6070V (serv.man7) Service Manual online

MX-6070N  MX-5070N/6070N/5050N/6050N (MAIN UNIT)  1 – 3
4)
Insert the developing unit so as not to give a strong shock to the
main unit gently.Raise a lever to the right.
Slide the developing unit horizontally into the machine, in the
direction of the arrow, until developing unit locks into. place.
Do not push the unit diagonally, as contact with the drum may
occur causing damage.
When removing or installing the developing unit, put your hand
from below the unit and slide it in parallel along the guide.
At that time, be careful not to touch the roller surface.
When installing the machine, there is no need to remove or install
the OPC drum unit. If it must be removed or installed for any rea-
son, follow the procedures below. When removing or installing the
OPC drum unit, put your hand from below the unit and slide it in
parallel along the guide on the right side.
At that time, be careful not to touch the OPC drum surface.
5)
Close the drum positioning cover, and lock it. 
6)
Connect the connecter.
B. Packed items check
C. Lock release
(1)
Tray rotation plate lock release
1)
Pull out the tray. Turn the fixing material and remove it. Remove
the caution label. 
Attach the removed fixing material to the position shown in the fig-
ure for future use. 
Close the tray which was pulled out.
Ĭ
ĭ
ĭ
ĭ
Ĭ
No.
Name
Quantity
1
Operation manual
1
2
Protection sheet
1
Ĭ
2
1
1
: ‘16/Sep.
1
1
Page of 127
Display

Click on the first or last page to see other MX-5050N / MX-5050V / MX-5070N / MX-5070V / MX-6050N / MX-6050V / MX-6070N / MX-6070V (serv.man7) service manuals if exist.