AR-MS1. ARMS1 Service Manual - Sharp Copying Equipment Service Manual (repair manual). Page 6

Read Sharp AR-MS1 Service Manual online

AR-MS1 UNPACKING AND INSTALLATION-3
9) Arrange the harness of the mail-bin stacker.
<1>Pass the harness of the mail-bin stacker between the power supply 
unit and the frame of the stand/paper drawer and connect it to the 
connector of the power supply unit.
<2>Fit the snap band attached to the mail-bin stacker at the position 
shown in the illustration to fix the harness.
10) Attach the rear cabinet of the stand/paper drawer.
<1>Pass the AC cord of the power supply unit as shown in the illustration 
and fix the rear cabinet of the stand/paper drawer with the screws.
<2>Attach the AC inlet cover to the rear cabinet of the stand/paper 
drawer and fix it with the removed screw.
11) Connect the AC cord of the optional power supply unit to the main
unit of the printer.
<1>Connect the AC cord of the power supply unit to the inlet connector 
of the main unit of the printer at the location shown in the illustration.
Power supply
unit connector
Snap band
Mail-bin stacker harness
Rear cabinet
Screw
AC inlet cover
AC cord
Page of 23
Display

Click on the first or last page to see other AR-MS1 service manuals if exist.