AR-M620 (serv.man27). ARM550 620 Installation Manual - Sharp Copying Equipment Service Manual (repair manual). Page 16

Read Sharp AR-M620 (serv.man27) Service Manual online

AR-M550/M620  INSTALLATION MANUAL  (AR-LC6)  2 - 3
E. Attach the large capacity tray to the main unit.
1) Hold the grips of the front and the rear cabinets with both hands,
and lift the left side.
2) Hang the metal fixture of the large capacity tray on the lower front/
rear side of the connecting plate on the main unit side.
Push the large capacity tray onto the main unit and attach it.
At that time, check that the large capacity tray is locked to the main
unit.
If lock is incomplete, when the power switch is turned on, the mes-
sage,  “Check installation of tray 5” is displayed on the operation
panel.
Push the large capacity tray onto the machine, and lock it securely.
[Note]
Note 1): When lifting the LCC, insert fingers into the grip sections of
the front and rear cabinets and install slowly.
Note 2): Turn the lock release screw of the front cover counterclock-
wise to loosen and check that the screw is free.
If the screw is tight at that time, installation will be incom-
plete.
<<How to separate the large capacity tray from the main unit>>
1) Turn the lock release screw of the front cover clockwise and
tighten the screw securely to release lock.
2) Then hold the grips of the front and the rear cabinets with both
hands, and lift the left side. The large capacity tray will come off.
F side
R side
Page of 56
Display

Click on the first or last page to see other AR-M620 (serv.man27) service manuals if exist.