AR-FN5 (serv.man2). Operational descriptions Disassembly and assembly Adjustments - Sharp Copying Equipment Service Manual (repair manual). Page 14

Read Sharp AR-FN5 (serv.man2) Service Manual online

C. Gate solenoid right
Mark the solenoid installing position before replacement, and fix a new
one to the marked position.
After fixing, press the plunger with your finger to adjust so that the
lead edge of the gate right is in a position 16.5mm ~ 17mm apart from
the alignment tray transport surface. Release the finger and check
that it returns smoothly by the spring and that the lead edge of the
gate right is in a position 36mm apart from the transport surface.
D. Gate solenoid left
Mark the solenoid installing position before replacement, and fix a new
one to the marked position.
After fixing the solenoid, check and adjust so that the gate left edge is
in contact with the transport surface on the transport PG with the
plunger released, and so that the gate left edge is 6.5 - 7mm from the
transport surface.
E. Upper alignment solenoid
Mark the solenoid installing position before replacement, and fix a new
one to the marked position.
After fixing, pull the plunger with your finger and check that the upper
alignment holding plate is in contact with the alignment tray. Then
release the finger and check that the plunger returns smoothly by the
spring.
F. Shutter solenoid
Mark the solenoid installing position before replacement, and fix a new
one to the marked position.
After fixing, pull the plunger with your finger and check that the shutter
rotates 90 degrees and makes contact with the tray. Then release the
finger and check that the shutter returns smoothly by the spring and
that it is vertical to the alignment tray after returning.  
16.5   17mm
36 mm
6.5   7mm
90
O
Page of 15
Display

Click on the first or last page to see other AR-FN5 (serv.man2) service manuals if exist.