Read Sharp AR-335 (serv.man148) Technical Bulletin online
3.Action:
From the 1st lot of 1998 October production.
3. Measure to improve problems of noise.
1.Model Name:
AR280/285/335 (only for machines bound for the 200 V series destinations).
2.General:
A protect sheet has been attached to the square pipes on the lower side of the operations
panel. This action has been carried out as a measure to improve problems of noise. By
pressing the harness to the operations panel and the ferrite core against the frame, a
change occurs in the level of noise.
panel. This action has been carried out as a measure to improve problems of noise. By
pressing the harness to the operations panel and the ferrite core against the frame, a
change occurs in the level of noise.
3.Action:
From 1998 mid-June production.
Sharp Electronics (UK)Ltd., Technical Services Group
ICU protect sheet S
The core should be settled properly
Attachment standard Y
(The lower face of the square pipe)
(The lower face of the square pipe)
Click on the first or last page to see other AR-335 (serv.man148) service manuals if exist.