PN-R603/R703 Installation Guidelines <Rev1.0> February 2013
CONFIDENTIAL
15
Precautions in installing and handling 2
Worker position, assignment of work and cautions at lifting up the display.
Please wear gloves and safety shoes when you lift up this display.
For lifting up the display
2 people(“60” inch) or 3 people(“70” inch)
is required.
Following the image below, please check the position and assignment for each worker.
WorkerA
(For “60” / ”70”);
Hold the side(short side) of the main
body with left hand.
hold the underside(long side) of the
main body with right hand.
body with left hand.
hold the underside(long side) of the
main body with right hand.
WorkerB
(For “60” / ”70”);
Hold the side(short side) of the main
body with right hand.
hold the underside(long side) of the
main body with left hand.
body with right hand.
hold the underside(long side) of the
main body with left hand.
PN-R603/R703 are no handle design, and it is
possible to hold any parts of bezel. When holding,
please hold the display with the bottom hand, and the
top hand hold to support the display balance.
Please install PN-
possible to hold any parts of bezel. When holding,
please hold the display with the bottom hand, and the
top hand hold to support the display balance.
Please install PN-
R603/R703 refer to “UP” mark label
in vertical orientation.
Width
(mm)
Depth
(mm)
Height
(mm)
Weight
(kg)
PN-R603
1,378
39.4
794
32(approx.)
PN-R703
1,578
39.4
916
43(approx.)
<Main body size>
This is reception unit.
Please do not hold it.
Please do not hold it.
WorkerC
(Only for ”70”);
Hold the top side(long side) of the main body with left hand.
hold the underside(long side) of the main body with right hand.
hold the underside(long side) of the main body with right hand.
“UP” mark label