PN-L802B. Installation Guidelines (without Sharp stand) - Sharp Monitor Handy Guide. Page 11

Read Sharp PN-L802B Handy Guide online

PN-L802B Installation Guidelines <Rev1.0> February 2012 
CONFIDENTIAL 
The space to carry in 
10 
Precautions for carrying 3 
1. The space to carry in 
Please carry the main body with wheeled platform to the installation place. 
 The following space is necessary to pass through with wheeled platform  
wheeled platform size : Width : 300mm or less, Height : 150mm or less) 
 
   2. The space of corners 
 
When there is a corner on the carrying course, more   
   than 1,200mm/1,000mm width(Package/only the  
   main body) is necessary. 
 
Caution : Please do not hit the side of package to the corner. 
 
wall 
wall 
wall 
The main body 
wall 
wall 
Ceiling 
wheeled platform 
 
 
Width 
Height 
Package 
500mm or more 
1,650mm or more 
Only the main body 
300mm or more 
1,400mm or more 
 
 
Space 
Package 
1,200mm or more 
Only the main body 
1,000mm or more 
Package : 1,200mm 
Only the main body : 1,000mm 
Package : 1,650mm 
Only the main body : 1,400mm 
Package : 500mm 
Only the main body : 300mm 
                                 (Width of wheeled platform ) 
Package : 1,200mm 
Only the main body : 1,000mm 
wall 
Page of 15
Display

Click on the first or last page to see other PN-L802B service manuals if exist.