PN-70TA3 (serv.man12) - Sharp Monitor User Guide / Operation Manual. Page 19

Read Sharp PN-70TA3 (serv.man12) User Guide / Operation Manual online

19
E
Touch Panel / Touch Pen Preparations
Connecting the touch pen adapter
To use the touch pen, insert the touch pen adapter into the 
touch pen adapter port on the monitor.
Touch pen 
adaptor
Touch pen 
adapter screw
 (antitheft)
Touch pen 
adapter port
Touch Pen Preparations
n
Inserting the battery
1.  Remove the battery cap.
2.  Open the cover and insert the supplied battery (LR-03 
(“AAA” size)) into the touch pen.
Check the plus (+) and minus (-) markings on the inside 
of the touch pen and insert the battery in the correct 
orientation.
Battery cap
1
2
3.  Replace the cover and battery cap.
TIPS
•  The supplied battery (LR-03 (“AAA” size)) may be 
exhausted in a short time, depending on how it was stored.
•  If the touch pen will not be used for an extended time, 
remove the battery from the touch pen.
•  For the battery, use an alkaline battery.
Computer preparations
To use the touch panel and the touch pen, install the software 
below.
WHITEBOARD
The software is already installed.
Computer
•  Touch Panel Settings Tool
•  Touch Pen Utility
•  Pen Software
To install the software, see the manual for each.
Calibration
Calibration is used to perform position alignment so that the 
mouse cursor moves to the correct position when the screen 
is touched.
•  If you will be using the touch panel with a computer, 
perform calibration from the Touch Panel Settings Tool. 
For details, see the Touch Panel Settings Tool Operation 
Manual.
•  To perform calibration on the WHITEBOARD, follow the 
steps below.
1.  Switch the input to WHITEBOARD.
2.  Touch the launch button.
Launch button
The launcher appears.
3.  Touch [Setting].
You will be prompted to enter a password.
4.  Enter the password and touch [OK].
  Enter the password set in the Admin Password. If a 
password is not set, enter “00000”.
5.  Touch [Admin Settings] and [Calibration].
6.  Follow the instructions on the screen to perform 
calibration.
Page of 72
Display

Click on the first or last page to see other PN-70TA3 (serv.man12) service manuals if exist.