PT-VW350, PT-VW350D, PT-VW350T, PT-VX420, PT-VX420D, PT-VX420T, PT-VX421 (serv.man4) - Panasonic Projector Service Manual (repair manual). Page 76

Read Panasonic PT-VW350 / PT-VW350D / PT-VW350T / PT-VX420 / PT-VX420D / PT-VX420T / PT-VX421 (serv.man4) Service Manual online

ADJ-20
SECTION 3 ADJUSTMENTS
ȥȸȴȲȡȀȯȰȴȩȯȮ
ȦȲȥȥȺȥȀȭȥȳȳȡȧȥȀ
ȯȮ
ȦȡȮȀȦȵȬȬȀȭȯȤȥȀ
ȯȦȦ
ȶȧȡȖȐȏȔȘȐȰȀ
ȡȵȴȯ
ȥȭȵȬȡȴȥ
ȍȀȢȡȵȤȀȲȡȴȥȀ
șȖȐȐ
ȍȀȶȥȲȳȩȯȮȀ
ȍȍȍȀȏȀȭȑȡ
ȍȀȩȮȰȵȴȀȳȥȬȥȣȴ
ȳȥȬȦȀȣȨȥȣȫ
ȴȥȳȴȀȰȡȴȴȥȲȮ
ȦȬȩȣȫȥȲȀȡȤȪȵȳȴ
ȭȯȤȥȬȀȮȯȎȳȥȴȴȩȮȧ
ȰȡȮȥȬȀȴȹȰȥȀȳȥȴȴȩȮȧȀ
Ȭ
ȦȡȮȀȶȯȬȴȀȡȤȪȵȳȴ
ȩȮȰȵȴȀȡȵȴȯȀȣȡȬȩȢȲȡȴȩȯȮ
ȷȨȩȴȥȀȢȡȬȡȮȣȥȀȡȤȪȵȳȴ
ȫȥȹȳȴȯȮȥȀȣȡȬȩȢȲȡȴȩȯȮ
ȣȬȯȧȀȳȥȮȳȯȲȀȣȡȬȩȢȲȡȲȩȯȮȀ
ȵȮȤȥȲȀȀȒȐȐɍ
/1&'.015'66+0)
%$:%
%$:%
68:6
-8:
)8:
&8:&
/1&'.015'66+0)
%$9%
6896
)89
&89&
ȥȸȴȲȡȀȯȰȴȩȯȮ
ȦȲȥȥȺȥȀȭȥȳȳȡȧȥȀ
ȯȮ
ȦȡȮȀȦȵȬȬȀȭȯȤȥȀ
ȯȦȦ
ȶȧȡȖȐȏȔȘȐȰȀ
ȡȵȴȯ
ȥȭȵȬȡȴȥ
ȍȀȢȡȵȤȀȲȡȴȥȀ
șȖȐȐ
ȍȀȶȥȲȳȩȯȮȀ
ȍȍȍȀȏȀȭȑȡ
ȍȀȩȮȰȵȴȀȳȥȬȥȣȴ
ȳȥȬȦȀȣȨȥȣȫ
ȴȥȳȴȀȰȡȴȴȥȲȮ
ȦȬȩȣȫȥȲȀȡȤȪȵȳȴ
ȭȯȤȥȬȀȮȯȎȳȥȴȴȩȮȧ
ȰȡȮȥȬȀȴȹȰȥȀȳȥȴȴȩȮȧȀ
Ȭ
ȦȡȮȀȶȯȬȴȀȡȤȪȵȳȴ
ȩȮȰȵȴȀȡȵȴȯȀȣȡȬȩȢȲȡȴȩȯȮ
ȷȨȩȴȥȀȢȡȬȡȮȣȥȀȡȤȪȵȳȴ
ȫȥȹȳȴȯȮȥȀȣȡȬȩȢȲȡȴȩȯȮ
ȣȬȯȧȀȳȥȮȳȯȲȀȣȡȬȩȢȲȡȴȩȯȮ
Ȁ
ȵȮȤȥȲȀȀȒȐȐɍ
ȣȬȯȧȀȳȥȮȳȯȲȀȣȡȬȩȢȲȡȴȩȯȮ
ȯȫ
ȣȡȮȣȥȬ
1. 10. Model no. setting
1.  Enter the service mode (EXTRA OPTION) and select [MODEL 
NO SETTING] and press [ENTER] button to enter the setting 
mode.
2.  Select the model no. of the projector with [
p
] [
q
] buttons and 
press [ENTER] button.
3.  After finishing, press [MENU] button to exit the setting mode.
1. 11. Clog sensor calibration
1. 11. 1. Preparation
This is to calibrate the clog sensor circuit.
•  This calibration should be done in the condition that the projector is 
completely assembled and place on the floor and the adjuster legs 
are set in the cabinet bottom.
• Replace the air filter with new one before starting calibration.
•  The work should be done at the location where there are no heat 
apparatus and the ventilation opening of the air-conditioner and the 
object to block the exhaust air.
1. 11. 2. Adjustment procedure
1.  Enter the service mode (EXTRA OPTION) and select [CLOG 
SENSOR CALIBRATION].
2.  Select the altitude range of your work place to with [
t
] [
u
] but-
tons and press [ENTER] button to enter the adjustment mode.
3. Select [OK] and press [ENTER] button to start the calibration.
  During the calibration, the projector indicates as the follow.
   
Screen display:  The message "CLOG CALIB Please wait..." on 
the black screen.
   
LED display: [ON(G)/STANDBY(R)] lights in green 
                              and blink in red.
   
 
 
[LAMP] lights in red
   
 
 
[WARNING] light in red
4.  After approx. 10 minutes, the calibration is complete and the black 
screen switches to normal screen.
• Do not turn off the projector during the calibration.
Page of 99
Display

Click on the first or last page to see other PT-VW350 / PT-VW350D / PT-VW350T / PT-VX420 / PT-VX420D / PT-VX420T / PT-VX421 (serv.man4) service manuals if exist.