PT-RZ31K, PT-RS30K (serv.man2) - Panasonic Projector Service Manual (repair manual). Page 118

Read Panasonic PT-RZ31K / PT-RS30K (serv.man2) Service Manual online

ADJ-12
SECTION 3 ADJUSTMENTS
<RZ31K/RS30K>
1. 6. Clog sensor calibration
[Note]]
  •  Projector should be completely assembled and the adjustable feet are com-
pletely accommodated in the body.
  •  Place the projector on the floor and replace the air filter with a new one.
  •  Calibration at a location where there are no heat apparatus and supply open-
ing of the air-conditioner.
  • This adjustment can be done under the intake temperature 20°C ~ 35°C.
1.  Enter the service mode, and select submenu [CLOG SENSOR CALIBRATION] 
of [EXTRA OPTION] menu.
2. Select the [OK], and press [ENTER] button to start the calibration
  •  When the calibration is started, the screen becomes whole magenta.
  •  Do not shut down the power of projector during the calibration.
  •  The progress is shown at the left top portion of the display with % unit.
3.  After approx 15 minutes, when the magenta screen disappear and return to 
the normal screen, calibration is completed.
4. Restart the main power of projector and check that it operates properly.
1. 7. Date and time setup
1. Select the [DATE AND TIME] of [PROJECTOR SETUP] menu.
2. Set the time zone, date, and time of the built-in clock of the projector.
  • For further instructions, refer to the operating instructions.
DATE AND TIME
TIME ZONE
ADJUST CLOCK
+09:00
12:15:36
2016/8/21
LOCAL DATE
LOCAL TIME
MENU SELECT
CHANGE
30 %
EXTRA OPTOPN
DYNAMIC GAMMA MODE
3DCMS
SHUTTER KEEP
ON
ON
OFF
SELF CHECK
POWER OFF MESSAGE
ERROR OSD
ELECTRICAL CONVERGENCE
MECHANICAL CONVERGENCE
MODEL
CLOG SENSOR CALIBRATION
LIGHT ADJUST
INDICATOR SETTING
MENU SELECT
SUB MENU
ENTER
CLOG SENSOR CALIBRATION
OK
CANCEL
CHANGE
EXECUTE
ENTER
Page of 127
Display