KX-CL500, KX-CL510 - Panasonic Copying Equipment Service Manual (repair manual). Page 124

Read Panasonic KX-CL500 / KX-CL510 Service Manual online

8.1. Fuser Unit
Caution :
 1. The fuser is hot. To avoid personal injury, wait 1 hour for fuser to cool after turning the power off, and then service it.
 2. When replacing parts, use only the manufacturer’s specified components.
 3. After servicing, be sure to restore the lead dress, insulation barriers, insulation papers, shields, etc.
 4. Before returning the serviced equipment to customer, be sure to perform the following section 2 “ Insulation Resistance Test
“ to prevent the customer from being exposed to shock hazards.
(1) Open the front door.
(2) Disconnect the fuser connector from the printer.
(3) Move the 2 fuser lock green tabs in the arrow directions to
unlatch the fuser unit.
(4) Remove the fuser unit.
Note: Removing the Fuser Unit
Regarding the detail information for removing the fuser
unit, see the section 3.2.5 “Installing the Fuser Unit”.
124
KX-CL500 / KX-CL510
Page of 127
Display

Click on the first or last page to see other KX-CL500 / KX-CL510 service manuals if exist.