5. 1 Installation Requirements
Make sure machine is properly leveled from left to right and from front to rear (use
small carpenter level).
small carpenter level).
The mains plug on this equipment must be used to disconnect mains power. Please
ensure that the socket outlet is installed near the equipment and shall be easily
accessible.
ensure that the socket outlet is installed near the equipment and shall be easily
accessible.
The copier should be installed in a level and well-ventilated area, to minimize the
ozone density in the air.
ozone density in the air.
5.2 Contents Check
Contents
Check
1
Copier
2
Exit tray
3
Document bag
Copier
Exit tray
Multi-sheet bypass tray
14"/
350mm
350mm
4"/100mm
28"/
700mm
700mm
5.3 Unpacking
Check the condition and contents of the box for any shipping damage and
completeness before installation. (Visual check)
completeness before installation. (Visual check)