Read Panasonic CF-T4HWETZBM Service Manual online
The line of the remainder
is put on hinge (R) side.
is put on hinge (R) side.
Hinge (R)
Put the reflector part surely.
Put on hinge (R) surely.
Gasket (LCD)
Externals suiting of reflector
0
0
1mm
Putting of gasket (LCD)
Putting of LCD damper(C)
Rib edge match of LCD front case
0
0
1mm
Rib application putting of LCD front case
0
1mm
LCD Damper(C)
Plinth externals match
0
0
1mm
Rib application putting of LCD front case
0
0
1mm
Hook is attached
to the left
to the left
0
0.5mm
0
0.5mm
pressure is applied to
double-sided tape portion
double-sided tape portion
Specificatione affixation of LCD Hook Cushion
K70
K502
0
0.5mm
0
0.5mm
Putting of LCD Hook Cushion
Conductive cloth is wrapped
(Leave the half)
(Leave the half)
70
3mm
LCD Cable (Inverter)
LCD Cable (Touch Panel)
Putting of conductive cloth of LCD cable
The cable is processed under the shaft .
Note:It is confirmed that the cable does not narrow
between cabinets.
between cabinets.
Drawing out specification of LCD cable
37
Click on the first or last page to see other CF-T4HWETZBM service manuals if exist.