Read Panasonic KX-NTV160NE (serv.man2) Service Manual online
14
KX-NTV160 Series
Power on the unit then measuring the main voltage DC5V and DC3.3V with multimeter.
8.3.
Assembly procedure
Step1
A. Turn the multimeter to DCV setting.
B. Measure main board PCBA (TP14_GND) with COM probe of
B. Measure main board PCBA (TP14_GND) with COM probe of
multimeter.
C. Measure main board PCBA (TP20_5V9V) with Ω probe ;
check if the value is DC5.225V ~ 5.775V.
D. If the voltage is abnormal, check if other component is damage.
Step2
A. Turn the multimeter to DCV setting.
B. Measure main board PCBA (TP14_GND) with COM probe of
B. Measure main board PCBA (TP14_GND) with COM probe of
multimeter.
C. Measure main board PCBA (TP7_3V3) with Ω probe ;
check if the value is DC3.13V ~ 3.46V.
D. If the voltage is abnormal, check if other component is damage.
Step1
A. Assemble sensor board and main board back to back cover.
Note:
Please check the position of the Rubber.
Rubber
OK
Rubber
NG
Click on the first or last page to see other KX-NTV160NE (serv.man2) service manuals if exist.