Read Panasonic EY7440-U1 Service Manual online
Ref. No. 2C
Procedure 2A
→
→
→
→ 2B →
→
→
→ 2C
Removal or attachment of the Gear Box Block.
(Removal)
1. Turn the thrust plate to remove.
2. The internal parts of gear box block can be removed one after
another. (See Fig. 6)
1. Turn the thrust plate to remove.
2. The internal parts of gear box block can be removed one after
another. (See Fig. 6)
(Attachment)
1. Start from inserting 6 pins into the driving block as shown in the
Fig. 7.
2. Assemble the other parts in reverse order as shown in the Fig. 6.
1. Start from inserting 6 pins into the driving block as shown in the
Fig. 7.
2. Assemble the other parts in reverse order as shown in the Fig. 6.
NOTE :
Carriers and Ring Gears have their own correct directions for
proper reassembly.
proper reassembly.
3. Insert 2 pieces of steel ball into each 6 holes of gear case.
4. Set clutch plate and clutch spring.
4. Set clutch plate and clutch spring.
NOTE :
Clutch plate has its own correct direction for proper reassembly.
Fig. 6
Fig. 7
5
EY7440-U1 /
Click on the first or last page to see other EY7440-U1 service manuals if exist.