Read Panasonic NC-PH30ZTW (serv.man2) Service Manual online
23
4.27. Recheck
1. After assembly please recheck water leak, insulation resistance and operation, those are usual or unusual.
Insulation resister
• Measure by 500VDC insulation meter, the result should be more than 2M
. (Measuring between 2 pins of plug and screw)
Insulation resistance
• Should stand at 1000VAC for 1 minute. (Measuring location is same as INSULATION RESISTER)
Current check
• Thermo pot performance test mode (3.1.Thermo Pot performance test mode) and operation is usual or unusual.
4.28. PRODUCTION NO. POSITION
1. Production No. is located at bottome plate.