H-F008PP, H-F008E, H-F008GK - Panasonic Digital Camera Service Manual (repair manual). Page 11

Read Panasonic H-F008PP / H-F008E / H-F008GK Service Manual online

11
4.2.2.
Aassembly Procedure
1.Installing the Lens hood.
*.Install  6 screws (B) by ordering the following
screwing trque and numerical screwing order.
[Torque] : 10±1.2 N-cm
[Screwing order] : numerical order.(“(1)” to “(6)”)
2.Installing the Lens ring 2 U.
*.Install the Dust proof ring F and the Lens ring 2U.
*.Install  3 screws (A) by ordering the following
screwing trque and numerical screwing order.
[Torque] : 20±3 N-cm
[Screwing order] : numerical order.(“(1)” to “(3)”)
 NOTE:
Install the concerned parts by referring the “4.1.Disassem-
bly/Assembly procedures”.
When screwing the screws, follow the screwing torque and
screwing order.
Page of 14
Display

Click on the first or last page to see other H-F008PP / H-F008E / H-F008GK service manuals if exist.