WV-CL920A, WV-CL924A - Panasonic Video Monitoring Service Manual (repair manual). Page 7

Read Panasonic WV-CL920A / WV-CL924A Service Manual online

2-2
Remove four screws.
8
Referring to Fig. 2-5, remove one screw that secure the
I/F Board and Power Board.
8
Disconnect the connectors CN402 and CN403 on the
Main Board, and remove the I/F Board.
8
Disconnect the connector CN404 on the Main Board and
remove the Power Board.
8
Remove one screw that secure the Earth Lug and
Washer, and remove the Earth Lug and Washer (For WV-
CL920A only).
Fig. 2-6
8
Reconnect the CN1, CN8 on the I/F Board to CN402,
CN403  on the Main Board.
8
Reconnect the connectors by using the Extension Cable
(Refer to Fig. 1-2), between CN404 on the Main Board
and CN101 on the Power Board for Adjustment.
Fig. 2-3
Fig. 2-4
8
Referring to Fig. 2-4, remove one screw that secure the
Front Unit.
(Disconnect the connectors CN9 on the I/F Board and
CN401 on the Main Board, remove the Wire Ass'y and
the Flexible Board Ass’y, and remove the Front Unit for
servicing the Sensor Board Ass’y.)
8
Referring to Fig. 2-3, remove the Rear Escutcheon and
the Rear Panel while Releasing the four hooks of the
Rear Escutcheon.
Remove one screw.
Front Unit
Rear Panel
Hooks
8
Referring to Fig. 2-6, remove four screws that secure the
Main Board and remove the Main Board from the Main
Chassis.
Fig. 2-5
Remove 
one screw.
CN402
Main
Board
CN404
Earth
Lug
Washer
Remove
one
screw.
CN101
CN1
Power
Board
I/F Board
Remove 
one screw.
Main
Board
CN404
CN101
CN1
Power
Board
I/F Board
(WV-CL920A)
(WV-CL924A)
Main Chassis
Main Board
Rear Escutcheon
Flexible Board Ass’y
CN401
Wire Ass'y
I/F Board
CN9
Main Board
CN9
CN9
CN403
CN402
CN403
CN8
CN8
Page of 33
Display

Click on the first or last page to see other WV-CL920A / WV-CL924A service manuals if exist.