CS-XE9CKE, CU-XE9CKE, CS-XE12CKE, CU-XE12CKE - Panasonic Air Conditioner Service Manual (repair manual). Page 38

Read Panasonic CS-XE9CKE / CU-XE9CKE / CS-XE12CKE / CU-XE12CKE Service Manual online

8.2.3.6. Deice Control
A. Deice operation (Normal Deice Operation)
 1. Detection methods
Outdoor heat exchanger temperature sensor, timer.
 2. Deice operation time chart
Notes
 a. During deice operation, the relationship between outdoor pipe temperature and time T5 is such operation will
proceed to next stage.
 b. The deice will be performed only after 1 hour from when the operation has started.
 c. When Comp. OFF by the sequence No. 1~7 compressor can restart back without 3 minutes waits (immediate
restart).
Outdoor heat exchanger temperature
a
15°C
b
18°C
c
25°C
38
CS-XE9CKE CU-XE9CKE / CS-XE12CKE CU-XE12CKE
Page of 110
Display

Click on the first or last page to see other CS-XE9CKE / CU-XE9CKE / CS-XE12CKE / CU-XE12CKE service manuals if exist.