Read LG 42LD550 (CHASSIS:LA02B) Service Manual online
- 16 -
6.1. Method
- Check that Power Cord is fully inserted to the SET.
(If loose, re-insert)
- Unit fully inserted Power cord, Antenna cable and A/V
arrive to the auto-check process.
- Connect D-terminal to AV JACK TESTER
- Auto CONTROLLER(GWS103-4) ON
- Perform GND TEST
- If NG, Buzzer will sound to inform the operator.
- If OK, changeover to I/P check automatically.
- Auto CONTROLLER(GWS103-4) ON
- Perform GND TEST
- If NG, Buzzer will sound to inform the operator.
- If OK, changeover to I/P check automatically.
(Remove CORD, A/V form AV JACK BOX)
- Perform I/P test
- If NG, Buzzer will sound to inform the operator.
- If OK, Good lamp will lit up and the stopper will allow the
- If NG, Buzzer will sound to inform the operator.
- If OK, Good lamp will lit up and the stopper will allow the
pallet to move on to next process.
6.2. Checkpoint
• TEST voltage
- GND: 1.5KV/min at 100mA
- SIGNAL: 3KV/min at 100mA
- SIGNAL: 3KV/min at 100mA
• TEST time: 1 second
• TEST POINT
• TEST POINT
- GND TEST = POWER CORD GND & SIGNAL CABLE
METAL GND
NEUTRAL
• LEAKAGE CURRENT: At 0.5mArms
7. Audio
Measurement condition:
1. RF input : Mono, 1KHz sine wave signal, 100%
1. RF input : Mono, 1KHz sine wave signal, 100%
Modulation
2. CVBS, Component : 1KHz sine wave signal 0.4Vrms
3. RGB PC : 1KHz sine wave signal 0.7Vrms
8. Etc
No Item Min
Typ
Max
Unit
1. Audio practical max
9.0 10.0
12.0 W EQ
Off
Output, L/R
AVL Off
(Distortion=10%
8.5
8.9
9.8
Vrms
Clear
max Output)
Voice Off
2. Speaker (8
Ω
TDB TDB W EQ
On
Impedance) AVL
On
Clear
Voice On
Power Status
Main B/D Shipping Condition
AC Swithch condtion
Chassis Module Assembly ON N/A
Front Module Assembly
N/A OFF
Factory incoming
ON
OFF
Final Assembly
ON
ON
Ship-Out OFF
ON
Click on the first or last page to see other 42LD550 (CHASSIS:LA02B) service manuals if exist.