Read JBL SB 300 (serv.man6) EMC - CB Certificate online
Neutron Engineering Inc.
Report No.: NEI-EMC-1-1009C113 Page 8 of 97
2.1 TEST FACILITY
The test facilities used to collect the test data in this report is SR01/SR03 at the location of
No.3,Jinshagang 1st Road, ShiXia, Dalang Town,Dong Guan, China.523792.
2.2 MEASUREMENT UNCERTAINTY
Where relevant, the following measurement uncertainty levels have been estimated
for tests performed on the EUT as specified in CISPR 16-4-2:
for tests performed on the EUT as specified in CISPR 16-4-2:
The reported uncertainty of measurement y ± U,where expended uncertainty U is based on a
standard uncertainty multiplied by a coverage factor of k=2,providing a level of confidence of
approximately 95 %。
A. Mains Terminal Disturbance Voltage Test : 2.44 dB
B. Radiated Disturbance Test :
Test Site Method
Measurement Frequency
Range
Ant.
H / V
U,(dB)
NOTE
SR01
30MHz ~ 300MHz
2.64
SR03
2.85
C. Harmonic/ Flicker Measurement :
Test item
U
NOTE
IEC 61000-3-2 Voltage: 0.04%; Current: .191%; Frequency: 2.8x10
-10
IEC 61000-3-3 Voltage: 0.04%; Current: .191%; Frequency: 2.8x10
-10
D. Immunity Measurement :
Test item
U
NOTE
IEC 61000-4-2
Voltage: 1.6%; Timing: 2.8%
IEC 61000-4-3
2.66 dB
IEC 61000-4-4
Voltage: 1.6%; Timing: 2.8%; Frequency: 2.8x10
-10
Click on the first or last page to see other SB 300 (serv.man6) service manuals if exist.