Read JBL SB 300 (serv.man6) EMC - CB Certificate online
Neutron Engineering Inc.
Report No.: NEI-EMC-1-1009C113 Page 16 of 97
4.1.6 BLOCK DIAGRAM OF TEST SETUP
EUT-1
L.I.S.N.#1
Test Receiver
DVD
AC
Mains
Audio Cable
EUT-2
L.I.S.N.#2
AC
Mains
Remote
Fiber Cable
4.1.7 EUT OPERATING CONDITIONS
The EUT exercise program used during radiated and/or conducted emission measurement was
designed to exercise the various system components in a manner similar to a typical use. The
standard test signals and output signal as following:
1. Input signal: A sinusoidal signal at 1kHz.
2. Output signal: The audio output signal shall be adjusted by the volume control to be 1/8 of the
rated output power for each output
This operating condition was tested and used to collect the included data.
The EUT exercise program used during radiated and/or conducted emission measurement was
designed to exercise the various system components in a manner similar to a typical use. The
standard test signals and output signal as following:
1. Input signal: A sinusoidal signal at 1kHz.
2. Output signal: The audio output signal shall be adjusted by the volume control to be 1/8 of the
rated output power for each output
This operating condition was tested and used to collect the included data.
Click on the first or last page to see other SB 300 (serv.man6) service manuals if exist.