Read JBL ON BEAT AIR (serv.man3) EMC - CB Certificate online
www.tuv.com
Page 17 of 116
Report No.: 11023927 001
IEC 60950-1
Clause
Requirement + Test
Result - Remark
Verdict
TRF No. IEC60950_1B
2.10.1.6
Special separation requirements
Not applied.
N/A
2.10.1.7
Insulation in circuits generating starting pulses
No such circuit.
N/A
2.10.2
Determination of working voltage
P
2.10.2.1
General
The rms and the peak
voltage were measured with
unit connected to a 240V TN
power system.
voltage were measured with
unit connected to a 240V TN
power system.
Pollution Degree 2 and
Overvoltage Category II
considered.
Overvoltage Category II
considered.
P
2.10.2.2
RMS working voltage
(See appended table 2.10.2)
P
2.10.2.3
Peak working voltage
(See appended table 2.10.2)
P
2.10.3
Clearances
See below and advantage of
annex G is not considered.
annex G is not considered.
P
2.10.3.1
General
Considered.
P
2.10.3.2
Mains transient voltages
P
a) AC mains supply ...............................................: 240V a.c. and Overvoltage
Category II
P
b) Earthed d.c. mains supplies ..............................:
N/A
c) Unearthed d.c. mains supplies ..........................:
N/A
d) Battery operation ...............................................:
N/A
2.10.3.3
Clearances in primary circuits
(see appended table 2.10.3
and 2.10.4)
and 2.10.4)
P
2.10.3.4
Clearances in secondary circuits
Sub-clause 5.3.4 considered.
P
2.10.3.5
Clearances in circuits having starting pulses
N/A
2.10.3.6
Transients from a.c. mains supply .........................: Normal transient voltage
considered (overvoltage
category II for primary
circuit).
category II for primary
circuit).
N/A
2.10.3.7
Transients from d.c. mains supply .........................:
N/A
2.10.3.8
Transients from telecommunication networks and
cable distribution systems .....................................:
cable distribution systems .....................................:
N/A
2.10.3.9
Measurement of transient voltage levels
N/A
a) Transients from a mains suplply
N/A
For an a.c. mains supply .......................................:
N/A
For a d.c. mains supply .........................................:
N/A
b) Transients from a telecommunication network :
N/A
Click on the first or last page to see other ON BEAT AIR (serv.man3) service manuals if exist.