ES 150PW (serv.man4) - JBL Audio EMC - CB Certificate (repair manual). Page 10

Read JBL ES 150PW (serv.man4) EMC - CB Certificate online

ELECTRONICS TESTING CENTER(ETC), TAIWAN 
File No. : 08-07-RBF-038-01 
EMC TESTING DEPARTMENT II
       Page: 9 / 42 
 
 
3.2 Immunity: 
3.2.1  Immunity Criteria: 
The results of all of the immunity tests performed on the EUT were evaluated according to the 
following criteria, and according to the manufacturer’s specifications for the EUT: 
Performance criterion CT :  The performance criteria A shall apply. Tests shall be repeated 
with the EUT in standby mode (if applicable) to ensure that 
unintentional transmission does not occur. In systems using 
acknowledgement signals, it is recognized that an 
ACKnowledgement (ACK) or Not ACKnowlegdgement 
(NACK) transmission may occur, and steps should be taken to 
ensure that any transmission resulting from the application of 
the correctly interpreted. 
Performance criterion TT :  The performance criteria B shall apply, except for voltage dips 
of 100 ms and voltage interruptions of 5000ms duration, for 
which performance criteria C shall apply. Tests shall be 
repeated with the EUT in standby mode (if applicable) to ensure 
that unintentional transmission does not occur. Iin systems 
using acknowledgement signals, it is recognized that an 
acknowledgement (ACK) or notacknowledgement (NACK) 
transmission may occur, and steps should be taken to that any 
transmission resulting from the application of the test is 
correctly interpreted.   
Performance criterion CR:  The performance criteria A shall apply. Where the EUT is a 
transceiver, under no circumstances, shall the transmitter 
operate unintentionally during the test. In systems using 
acknowledgement signals, it is recognized that an ACK or 
NACK transmission may occur, and steps should be taken to 
ensure that any transmission resulting from the application of 
the test is correctly interpreted.   
Performance criterion TR:  The performance criteria B shall apply, except for voltage dips 
of 100 ms and voltage interruptions of 5000ms duration for 
which performance criteria C shall apply. Where the EUT is a 
transceiver, under no circumstances, shall the transmitter 
operate unintentionally during the test. In systems using 
acknowledgement signals, it is recognized that an ACK or 
NACK transmission may occur, and steps should be taken to 
ensure that any transmission resulting from the application of 
test is correctly interpreted.   
Page of 52
Display

Click on the first or last page to see other ES 150PW (serv.man4) service manuals if exist.