35
6.8 EFT/BURST TESTING
6.8.1 Test Specification
Basic Standard:
IEC 61000-4-4
Test Voltage:
Power Line:1 kV, Coaxial Cable:0.5 kV
Impulse Wave shape :
5/50 ns
Burst Duration:
15 ms
Burst Period:
300 ms
Test Duration:
Not less than 1 min.
6.8.2 Test Procedure
The EUT and support equipment, are placed on a table that is 0.8 meter above a metal
ground plane measured 1m*1m min. and 0.65mm thick min.
The other condition as following manner:
a. The length of power cord between the coupling device and the EUT should not
exceed 1 meter.
b. Both positive and negative polarity discharges were applied.
c. The duration time of each test sequential was 1 minute
d. For the actual test configuration, please refer to the related Item –EUT Test Photos.
c. The duration time of each test sequential was 1 minute
d. For the actual test configuration, please refer to the related Item –EUT Test Photos.
6.8.3 Deviation From Test Standard
No deviation