Test report no. JSH0311243-001
Page 6 of 19
5.MAINS TERMINAL CONTINUOUS DISTURBANCE VOLTAGE
5.1 Test result
Pass Fail Not applicable
5.2 Operating environment
Temperature: 22 °C
Relative Humidity: 48 %
5.3 Test set-up and test procedure
5.1 Test result
Pass Fail Not applicable
5.2 Operating environment
Temperature: 22 °C
Relative Humidity: 48 %
5.3 Test set-up and test procedure
The mains terminal disturbance voltage was measured with the equipment under test(EUT) in a
screened room.
The EUT was placed on a 0.4m high non-metallic table above a 2m by 2m in size ground reference
plane(GRP),and keeps a distance of at least 0.8m from any of the other metallic surface.
The EUT was connected to an artificial mains network and at a distance of 0.8m from it. The mains
lead excess 0.8m was bundled to 0.3m or 0.4m parallel to the lead.
Amplitude measurements were performed with a quasi-peak detector and, if required, with an average
detector.
5.4 Measurement uncertainty
Mains terminal disturbance voltage, quasi-peak detection: + 2,0 dB
Mains terminal disturbance voltage, average detection: + 2,0 dB
The measurement uncertainty describes the overall uncertainty of the given measured value during the
operation of the EUT in the above mentioned way.
Measurement uncertainty is calculated in accordance with WECC 19-1990.
The measurement uncertainty is given with a confidence of 95%