BDS 275 (serv.man2) - Harman Kardon Audio EMC - CB Certificate (repair manual). Page 4

Read Harman Kardon BDS 275 (serv.man2) EMC - CB Certificate online

R
 
AUDIX Technology (Shenzhen) Co., Ltd.
 
 
                                    Audix Technology (Shenzhen) Co., Ltd. Report No. ACS-E12377      page 4 of 323 
 
7.3.
 
Test Standard ........................................................................................................................ 187
 
7.4.
 
Limits of Harmonic Current.................................................................................................. 187
 
7.5.
 
EUT Configuration on Test .................................................................................................. 187
 
7.6.
 
Operating Condition of EUT ................................................................................................ 187
 
7.7.
 
Test Procedure ...................................................................................................................... 188
 
7.8.
 
Test Results........................................................................................................................... 188
 
8. 
VOLTAGE FLUCTUATIONS & FLICKER TEST..................................................... 198 
8.1.
 
Test Equipments ................................................................................................................... 198
 
8.2.
 
Block Diagram of Test Setup................................................................................................ 198
 
8.3.
 
Test Standard ........................................................................................................................ 198
 
8.4.
 
Limits of Voltage Fluctuation and Flick............................................................................... 198
 
8.5.
 
EUT Configuration on Test .................................................................................................. 198
 
8.6.
 
Operating Condition of EUT ................................................................................................ 198
 
8.7.
 
Test Procedure ...................................................................................................................... 198
 
8.8.
 
Test Results........................................................................................................................... 198
 
9. 
DISTURBANCE VOLTAGE AT THE ANTENNATERMINALS ............................. 202 
9.1.
 
Test Equipments ................................................................................................................... 202
 
9.2.
 
Block Diagram of Test Setup................................................................................................ 202
 
9.3.
 
Limits of disturbance voltage at the antenna terminals: ....................................................... 202
 
9.4.
 
EUT Configuration on Test .................................................................................................. 202
 
9.5.
 
Operating Condition of EUT ................................................................................................ 202
 
9.6.
 
Test Procedure ...................................................................................................................... 203
 
9.7.
 
Test Result ............................................................................................................................ 203
 
10. 
IMMUNITY PERFORMANCE CRITERIA DESCRIPTION .................................... 205 
11. 
ELECTROSTATIC DISCHARGE IMMUNITY TEST .............................................. 207 
11.1.
 
Test Equipments ................................................................................................................... 207
 
11.2.
 
Block Diagram of Test Setup................................................................................................ 207
 
11.3.
 
Test Standard ........................................................................................................................ 207
 
11.4.
 
Severity Levels and Performance Criterion .......................................................................... 207
 
11.5.
 
EUT Configuration ............................................................................................................... 207
 
11.6.
 
Operating Condition of EUT ................................................................................................ 207
 
11.7.
 
Test Procedure ...................................................................................................................... 208
 
11.8.
 
Test Results........................................................................................................................... 208
 
12. 
RF FIELD STRENGTH SUSCEPTIBILITY TEST..................................................... 210 
12.1.
 
Test Equipments ................................................................................................................... 210
 
12.2.
 
Block Diagram of Test Setup................................................................................................ 210
 
12.3.
 
Test Standard ........................................................................................................................ 210
 
12.4.
 
Severity Levels and Performance Criterion .......................................................................... 210
 
12.5.
 
EUT Configuration ............................................................................................................... 210
 
12.6.
 
Operating Condition of EUT ................................................................................................ 210
 
12.7.
 
Test Procedure ...................................................................................................................... 211
 
12.8.
 
Test Results........................................................................................................................... 211
 
13. 
RF E.M. FIELD KEYED CARRIER TEST .................................................................. 213 
13.1.
 
Test Equipments ................................................................................................................... 213
 
13.2.
 
Block Diagram of Test Setup................................................................................................ 213
 
13.3.
 
Test Standard ........................................................................................................................ 213
 
13.4.
 
Severity Levels and Performance Criterion .......................................................................... 213
 
13.5.
 
EUT Configuration ............................................................................................................... 213
 
13.6.
 
Operating Condition of EUT ................................................................................................ 214
 
13.7.
 
Test Procedure ...................................................................................................................... 214
 
13.8.
 
Test Results........................................................................................................................... 214
 
14. 
ELECTRICAL FAST TRANSIENT/BURST IMMUNITY TEST.............................. 216 
14.1.
 
Test Equipments ................................................................................................................... 216
 
14.2.
 
Block Diagram of Test Setup................................................................................................ 216
 
Page of 127
Display

Click on the first or last page to see other BDS 275 (serv.man2) service manuals if exist.