BDS 275 (serv.man2) - Harman Kardon Audio EMC - CB Certificate (repair manual)

bds 275 (serv.man2) emc - cb certificate
Model
BDS 275 (serv.man2)
Pages
127
Size
13.97 MB
Type
PDF
Document
EMC - CB Certificate
Brand
Device
Audio
File
bds-275-sm2.pdf
Date

Read Harman Kardon BDS 275 (serv.man2) EMC - CB Certificate online

R
 
AUDIX Technology (Shenzhen) Co., Ltd.
 
 
                                    Audix Technology (Shenzhen) Co., Ltd. Report No. ACS-E12377      page 2 of 323 
 
 
 
 
 
EMC TEST REPORT 
 
For 
 
   Harman International Industries, Incorporated 
 
              BLU-RAY DISC SYSTEM 
 
        Model No.: BDS575, BDS275, BDS577, BDS277 
 
 
 
 
Prepared for : Harman International Industries, Incorporated 
8500 Balboa Blvd, Northridge, CA 91329, UNITED   
STSTES 
 
 
 
 
 
 
 
Prepared By : Audix Technology (Shenzhen) Co., Ltd. 
No. 6, Ke Feng Rd., 52 Block, 
Shenzhen Science & Industrial Park, 
Nantou, Shenzhen, Guangdong, China 
 
Tel: (0755) 26639496 
Fax: (0755) 26632877 
 
 
 
 
Report Number  : ACS-E12377 
Date of Test   
: Jun.27~Jul.05, 
2012 
Date of Report  : Jul.24, 
2012  
R
 
AUDIX Technology (Shenzhen) Co., Ltd.
 
 
                                    Audix Technology (Shenzhen) Co., Ltd. Report No. ACS-E12377      page 3 of 323 
 
 
 
TABLE OF CONTENT 
Description Page 
TEST REPORT VERIFICATION
....................................................................................... 7 
1. 
SUMMARY OF STANDARDS AND RESULTS .............................................................. 8 
1.1.
 
Description of Standards and Results ....................................................................................... 8
 
2. 
GENERAL INFORMATION.............................................................................................. 9 
2.1.
 
Description of Device (EUT).................................................................................................... 9
 
2.2.
 
Tested Supporting System Details .......................................................................................... 10
 
2.3.
 
Block Diagram of connection between EUT and simulators.................................................. 11
 
2.4.
 
Test Facility ............................................................................................................................ 12
 
2.5.
 
Measurement Uncertainty(95% confidence levels, k=2)................................................... 13
 
3. 
POWER LINE CONDUCTED EMISSION TEST ......................................................... 14 
3.1.
 
Test Equipments ..................................................................................................................... 14
 
3.2.
 
Block Diagram of Test Setup.................................................................................................. 14
 
3.3.
 
Test Standard .......................................................................................................................... 14
 
3.4.
 
Power Line Conducted Emission Limit.................................................................................. 14
 
3.5.
 
EUT Configuration on Test .................................................................................................... 15
 
3.6.
 
Operating Condition of EUT .................................................................................................. 15
 
3.7.
 
Test Procedure ........................................................................................................................ 15
 
3.8.
 
Power Line Conducted Emission Test Results ....................................................................... 16
 
4. 
CONDUCTED DISTURBANCE AT TELECOMMUNICATION PORTS TEST ...... 37 
4.1.
 
Test Equipments ..................................................................................................................... 37
 
4.2.
 
Block Diagram of Test Setup.................................................................................................. 37
 
4.3.
 
Test Standard .......................................................................................................................... 37
 
4.4.
 
Conducted Disturbance at Telecommunication Ports Limit ................................................... 37
 
4.5.
 
EUT Configuration on Test .................................................................................................... 37
 
4.6.
 
Operating Condition of EUT .................................................................................................. 38
 
4.7.
 
Test Procedure ........................................................................................................................ 38
 
4.8.
 
Conducted Disturbance at Telecommunication Ports Test Results ........................................ 38
 
5. 
RADIATED EMISSION TEST......................................................................................... 40 
5.1.
 
Test Equipments ..................................................................................................................... 40
 
5.2.
 
Block Diagram of Test Setup.................................................................................................. 41
 
5.3.
 
Test Standard .......................................................................................................................... 42
 
5.4.
 
Radiated Emission Limit......................................................................................................... 42
 
5.5.
 
EUT Configuration on Test .................................................................................................... 43
 
5.6.
 
Operating Condition of EUT .................................................................................................. 43
 
5.7.
 
Test Procedure ........................................................................................................................ 43
 
5.8.
 
Radiated Emission Test Results.............................................................................................. 44
 
6. 
DISTURBANCE POWER TEST...................................................................................... 55 
6.1.
 
Test Equipments ..................................................................................................................... 55
 
6.2.
 
Block Diagram of Test Setup.................................................................................................. 55
 
6.3.
 
Disturbance Power Limit ........................................................................................................ 55
 
6.4.
 
EUT Configuration on Test .................................................................................................... 55
 
6.5.
 
Operating Condition of EUT .................................................................................................. 55
 
6.6.
 
Test Procedure ........................................................................................................................ 56
 
6.7.
 
Disturbance Power Test Result............................................................................................... 56
 
7. 
HARMONIC CURRENT EMISSION TEST ................................................................ 187 
7.1.
 
Test Equipments ................................................................................................................... 187
 
7.2.
 
Block Diagram of Test Setup................................................................................................ 187
 
R
 
AUDIX Technology (Shenzhen) Co., Ltd.
 
 
                                    Audix Technology (Shenzhen) Co., Ltd. Report No. ACS-E12377      page 4 of 323 
 
7.3.
 
Test Standard ........................................................................................................................ 187
 
7.4.
 
Limits of Harmonic Current.................................................................................................. 187
 
7.5.
 
EUT Configuration on Test .................................................................................................. 187
 
7.6.
 
Operating Condition of EUT ................................................................................................ 187
 
7.7.
 
Test Procedure ...................................................................................................................... 188
 
7.8.
 
Test Results........................................................................................................................... 188
 
8. 
VOLTAGE FLUCTUATIONS & FLICKER TEST..................................................... 198 
8.1.
 
Test Equipments ................................................................................................................... 198
 
8.2.
 
Block Diagram of Test Setup................................................................................................ 198
 
8.3.
 
Test Standard ........................................................................................................................ 198
 
8.4.
 
Limits of Voltage Fluctuation and Flick............................................................................... 198
 
8.5.
 
EUT Configuration on Test .................................................................................................. 198
 
8.6.
 
Operating Condition of EUT ................................................................................................ 198
 
8.7.
 
Test Procedure ...................................................................................................................... 198
 
8.8.
 
Test Results........................................................................................................................... 198
 
9. 
DISTURBANCE VOLTAGE AT THE ANTENNATERMINALS ............................. 202 
9.1.
 
Test Equipments ................................................................................................................... 202
 
9.2.
 
Block Diagram of Test Setup................................................................................................ 202
 
9.3.
 
Limits of disturbance voltage at the antenna terminals: ....................................................... 202
 
9.4.
 
EUT Configuration on Test .................................................................................................. 202
 
9.5.
 
Operating Condition of EUT ................................................................................................ 202
 
9.6.
 
Test Procedure ...................................................................................................................... 203
 
9.7.
 
Test Result ............................................................................................................................ 203
 
10. 
IMMUNITY PERFORMANCE CRITERIA DESCRIPTION .................................... 205 
11. 
ELECTROSTATIC DISCHARGE IMMUNITY TEST .............................................. 207 
11.1.
 
Test Equipments ................................................................................................................... 207
 
11.2.
 
Block Diagram of Test Setup................................................................................................ 207
 
11.3.
 
Test Standard ........................................................................................................................ 207
 
11.4.
 
Severity Levels and Performance Criterion .......................................................................... 207
 
11.5.
 
EUT Configuration ............................................................................................................... 207
 
11.6.
 
Operating Condition of EUT ................................................................................................ 207
 
11.7.
 
Test Procedure ...................................................................................................................... 208
 
11.8.
 
Test Results........................................................................................................................... 208
 
12. 
RF FIELD STRENGTH SUSCEPTIBILITY TEST..................................................... 210 
12.1.
 
Test Equipments ................................................................................................................... 210
 
12.2.
 
Block Diagram of Test Setup................................................................................................ 210
 
12.3.
 
Test Standard ........................................................................................................................ 210
 
12.4.
 
Severity Levels and Performance Criterion .......................................................................... 210
 
12.5.
 
EUT Configuration ............................................................................................................... 210
 
12.6.
 
Operating Condition of EUT ................................................................................................ 210
 
12.7.
 
Test Procedure ...................................................................................................................... 211
 
12.8.
 
Test Results........................................................................................................................... 211
 
13. 
RF E.M. FIELD KEYED CARRIER TEST .................................................................. 213 
13.1.
 
Test Equipments ................................................................................................................... 213
 
13.2.
 
Block Diagram of Test Setup................................................................................................ 213
 
13.3.
 
Test Standard ........................................................................................................................ 213
 
13.4.
 
Severity Levels and Performance Criterion .......................................................................... 213
 
13.5.
 
EUT Configuration ............................................................................................................... 213
 
13.6.
 
Operating Condition of EUT ................................................................................................ 214
 
13.7.
 
Test Procedure ...................................................................................................................... 214
 
13.8.
 
Test Results........................................................................................................................... 214
 
14. 
ELECTRICAL FAST TRANSIENT/BURST IMMUNITY TEST.............................. 216 
14.1.
 
Test Equipments ................................................................................................................... 216
 
14.2.
 
Block Diagram of Test Setup................................................................................................ 216
 
Page of 127
Display

Download Harman Kardon BDS 275 (serv.man2) EMC - CB Certificate

Here you can read online and download Harman Kardon BDS 275 (serv.man2) EMC - CB Certificate in PDF. BDS 275 (serv.man2) emc - cb certificate will guide through the process and help you recover, restore, fix, disassemble and repair Harman Kardon BDS 275 (serv.man2) Audio. Information contained in service manuals typically includes schematics / circuit diagrams, wiring diagrams, block diagrams, printed wiring boards, exploded views, parts list, disassembly / assembly, pcb.