MX-5500N, MX-6200N, MX-7000N (serv.man28). MX-FNX3 4K Finisher-Installation Manual - Sharp Copying Equipment Peripheral (repair manual). Page 3

Read Sharp MX-5500N / MX-6200N / MX-7000N (serv.man28) Peripheral online

MX-7000N  MX-FNX3  7 – 3
A. Installation of the rail
1)
Install the rail (Package part No. 5) to the finisher with the fix-
ing screws (Package part No. 1).
2)
Install the rail reception sheet metal (Package part No. 6) to
the main unit with the fixing screws (Package part No. 2).
B. Installation of the connection fixture F/R
1)
Install the connection fixture R (Package part No. 8) to the
main unit with the fixing screws (Package part No. 3).
2)
Install the connection fixture F (Package part No. 7) to the
main unit with the fixing screws (Package part No. 3).
C. Check of the connected position of main unit 
and finisher.
1)
Insert the rail of the finisher into the slit on the rail reception
sheet metal of the main unit, install the finisher.
2)
Remove the screw, and remove the connector cover on rear
side of the finisher.
Page of 8
Display

Click on the first or last page to see other MX-5500N / MX-6200N / MX-7000N (serv.man28) service manuals if exist.