Read Sony DCR-TRV15E / DCR-TRV17E (serv.man2) Service Manual online
— 6 —
2-3.
TAPE PATH ADJUSTMENT ········································ 5-34
1.
Preparation for Adjustment ··········································· 5-34
2.
Procedure after operations ············································· 5-34
5-3.
VIDEO SECTION ADJUSTMENTS ··························· 5-35
3-1.
PREPARATIONS BEFORE ADJUSTMENTS ············ 5-35
3-1-1. Equipment Required ······················································ 5-35
3-1-2. Precautions on Adjusting ··············································· 5-36
3-1-3. Adjusting Connectors ···················································· 5-37
3-1-4. Connecting the Equipment ············································ 5-37
3-1-5. Alignment Tapes ··························································· 5-38
3-1-6. Input/Output Level and Impedance ······························ 5-38
3-2.
3-1-2. Precautions on Adjusting ··············································· 5-36
3-1-3. Adjusting Connectors ···················································· 5-37
3-1-4. Connecting the Equipment ············································ 5-37
3-1-5. Alignment Tapes ··························································· 5-38
3-1-6. Input/Output Level and Impedance ······························ 5-38
3-2.
SYSTEM CONTROL SYSTEM ADJUSTMENT ········ 5-39
1.
Initialization of B, C, D, E, F, 7, 8 Page Data ··············· 5-39
2.
Serial No. Input ····························································· 5-39
2-1.
Company ID Input ························································· 5-39
2-2.
Serial No. Input ····························································· 5-39
3-3.
SERVO AND RF SYSTEM ADJUSTMENT ··············· 5-41
1.
Cap FG Duty Adjustment (VC-260 board) ··················· 5-41
2.
PLL fo & LPF fo Adjustment (VC-260 board) ············· 5-41
3.
Switching Position Adjustment (VC-260 board) ··········· 5-42
4.
AGC Center Level and APC & AEQ Adjustment ········· 5-42
4-1.
Preparations before adjustments ···································· 5-42
4-2.
AGC Center Level Adjustment (VC-260 board) ··········· 5-43
4-3.
APC & AEQ Adjustment (VC-260 board) ···················· 5-43
4-4.
Processing after Completing Adjustments ···················· 5-44
5.
PLL fo & LPF fo Final Adjustment (VC-260 board) ···· 5-44
3-4.
VIDEO SYSTEM ADJUSTMENTS ····························· 5-45
1.
Chroma BPF f
0
Adjustment (VC-260 board) ················ 5-45
2.
S VIDEO OUT Y Level Adjustment (VC-260 board) ··· 5-45
3.
S VIDEO OUT Chroma Level Adjustment
(VC-260 board) ····························································· 5-46
(VC-260 board) ····························································· 5-46
4.
VIDEO OUT Y, Chroma Level Check (VC-260 board) ·· 5-46
3-5.
IR TRANSMITTER ADJUSTMENTS ························· 5-47
1.
IR Video Carrier Frequency Adjustment (VC-260 board) · 5-47
2.
IR Video Deviation Check (VC-260 board) ·················· 5-47
3.
IR Audio Deviation Check (VC-260 board) ·················· 5-48
3-6.
AUDIO SYSTEM ADJUSTMENTS ···························· 5-49
1.
Playback Level Check ··················································· 5-50
2.
Overall Level Characteristics Check ····························· 5-50
3.
Overall Distortion Check ··············································· 5-50
4.
Overall Noise Level Check ············································ 5-50
5.
Overall Separation Check ·············································· 5-50
5-4.
SERVICE MODE ·························································· 5-51
4-1.
ADJUSTMENT REMOTE COMMANDER ················ 5-51
1.
Using the adjustment remote commander ····················· 5-51
2.
Precautions upon using the adjustment remote
commander ···································································· 5-51
commander ···································································· 5-51
4-2.
DATA PROCESS ··························································· 5-52
4-3.
SERVICE MODE ·························································· 5-53
1.
Setting the Test Mode ···················································· 5-53
2.
Emergence Memory Address ········································ 5-53
2-1.
EMG Code (Emergency Code) ····································· 5-53
2-2.
MSW Code ···································································· 5-54
3.
Bit value discrimination ················································ 5-55
4.
Switch check (1) ···························································· 5-55
5.
Switch check (2) ···························································· 5-55
6.
Switch check (3) ···························································· 5-55
7.
Switch check (4) ···························································· 5-56
8.
Record of Use check ······················································ 5-56
9.
Record of Self-diagnosis check ····································· 5-57
6.
REPAIR PARTS LIST
6-1.
EXPLODED VIEWS ······················································ 6-1
6-1-1. OVERALL SECTION ····················································· 6-1
6-1-2. CABINET (R) SECTION ··············································· 6-2
6-1-3. LCD SECTION ······························································· 6-3
6-1-4. CABINET (L) SECTION ················································ 6-4
6-1-2. CABINET (R) SECTION ··············································· 6-2
6-1-3. LCD SECTION ······························································· 6-3
6-1-4. CABINET (L) SECTION ················································ 6-4
6-1-5. MAIN CHASSIS COMPLETE SECTION ····················· 6-5
6-1-6. EVF SECTION ································································ 6-6
6-1-7. OVERALL MECHANISM DECK SECTION (J100) ···· 6-7
6-1-8. LS CHASSIS BLOCK ASSEMBLY ······························· 6-8
6-1-9. MECHANISM CHASSIS BLOCK ASSEMBLY ··········· 6-9
6-2.
6-1-6. EVF SECTION ································································ 6-6
6-1-7. OVERALL MECHANISM DECK SECTION (J100) ···· 6-7
6-1-8. LS CHASSIS BLOCK ASSEMBLY ······························· 6-8
6-1-9. MECHANISM CHASSIS BLOCK ASSEMBLY ··········· 6-9
6-2.
ELECTRICAL PARTS LIST ········································ 6-10
Parts list of the VC-260 board are not shown.
Pages from 6-17 to 6-26 are not shown.
Pages from 6-17 to 6-26 are not shown.
*
Optical axis frame and color reproduction frame are
shown on pages 220 and 221.
shown on pages 220 and 221.
Click on the first or last page to see other DCR-TRV15E / DCR-TRV17E (serv.man2) service manuals if exist.