DCR-TRV12E, DCR-TRV14E, DCR-TRV19, DCR-TRV19E (serv.man4) - Sony Movie Service Manual (repair manual). Page 2

Read Sony DCR-TRV12E / DCR-TRV14E / DCR-TRV19 / DCR-TRV19E (serv.man4) Service Manual online

— 2 —
DCR-TRV12E/TRV14E/TRV19/TRV19E
TABLE OF CONTENTS
6.
ADJUSTMENT
1.
Before starting adjustment ··············································· 6-2
1-1.
Adjusting items when replacing main parts and boards. · 6-2
6-1.
CAMERA SECTION ADJUSTMENT ··························· 6-4
1-1.
PREPARATIONS BEFORE ADJUSTMENT
(CAMERA SECTION) ··················································· 6-4
1-1-1. List of Service Tools ························································ 6-4
1-1-2. Preparations ····································································· 6-5
1-1-3. Precaution ········································································ 6-7
1.
Setting the Switch ···························································· 6-7
2.
Order of Adjustments ······················································ 6-7
3.
Subjects ··········································································· 6-7
1-2.
INITIALIZATION OF 8, A, C, D, E, F, 1C PAGE DATA ····· 6-8
1-2-1. INITIALIZATION OF A, D PAGE DATA ······················ 6-9
1.
Initializing the A, D Page Data ········································ 6-9
2.
Modification of A, D Page Data ······································ 6-9
3.
A Page Table ···································································· 6-9
4.
D Page Table ···································································· 6-9
1-2-2. INITIALIZATION OF 8, C, 1C PAGE DATA ·············· 6-10
1.
Initializing the 8, C, 1C Page Data ································ 6-10
2.
Modification of 8, C, 1C Page Data ······························ 6-10
3.
8 Page Table ··································································· 6-11
4.
C Page Table ·································································· 6-11
5.
1C Page Table ································································ 6-12
1-2-3. INITIALIZATION OF E, F PAGE DATA ····················· 6-13
1.
Initializing the E, F Page Data ······································· 6-13
2.
Modification of E, F Page Data ····································· 6-13
3.
E Page Table ·································································· 6-13
4.
F Page Table ·································································· 6-14
1-3.
CAMERA SYSTEM ADJUSTMENTS ························ 6-15
1.
36MHz Origin Oscillation Adjustment (VC-311 board) ······ 6-15
2.
HALL Adjustment ························································· 6-15
3.
Flange Back Adjustment (Using Minipattern Box) ······· 6-16
4.
Flange Back Adjustment (Using Flange Back Adjustment
Chart and Subject More Than 500m Away) ·················· 6-17
4-1.
Flange Back Adjustment (1) ·········································· 6-17
4-2.
Flange Back Adjustment (2) ·········································· 6-17
5.
Flange Back Check ························································ 6-18
6.
Optical Axis Adjustment ··············································· 6-19
7.
Picture Frame Setting ···················································· 6-20
8.
Color Reproduction Adjustment ···································· 6-21
9.
MAX GAIN Adjustment ··············································· 6-22
10.
LV Standard Data Input ················································· 6-22
11.
Auto White Balance Standard Data Input ····················· 6-23
12.
Auto White Balance Adjustment ··································· 6-24
13.
White Balance Check ···················································· 6-25
14.
Steady Shot Check ························································· 6-26
1-4.
ELECTRONIC VIEWFINDER SYSTEM
ADJUSTMENT ····························································· 6-27
1.
VCO Adjustment (VA-118 board) ································· 6-27
2.
RGB AMP Adjustment (VA-118 board) ························ 6-28
2-1.
Automatic Adjustment ··················································· 6-28
2-2.
Manual Adjustment ······················································· 6-28
3.
Contrast Adjustment (VA-118 board) ···························· 6-29
3-1.
Automatic Adjustment ··················································· 6-29
3-2.
Manual Adjustment ······················································· 6-29
1-5.
LCD SYSTEM ADJUSTMENT ··································· 6-30
1.
VCO Adjustment (PD-188 board) ································· 6-30
2.
PSIG GRAY Adjustment (PD-188 board) ····················· 6-31
3.
RGB AMP Adjustment (PD-188 board) ························ 6-31
4.
Black Limit Adjustment (PD-188 board) ······················ 6-32
5.
Contrast Adjustment (PD-188 board) ···························· 6-32
6.
Center Level Adjustment (PD-188 board) ····················· 6-33
7.
V COM Adjustment (PD-188 board) ···························· 6-33
8.
White Balance Adjustment (PD-188 board) ·················· 6-34
6-2.
MECHANISM SECTION
ADJUSTMENT ····························································· 6-35
2-1.
HOW TO ENTER RECORD MODE WITHOUT
CASSETTE ··································································· 6-35
2-2.
HOW TO ENTER PLAYBACK MODE
WITHOUT CASSETTE ················································ 6-35
2-3.
TAPE PATH ADJUSTMENT ········································ 6-35
1.
Preparation for Adjustment ··········································· 6-35
2.
Processing after Completing Operations: ······················ 6-35
6-3.
VIDEO SECTION ADJUSTMENT ······························ 6-36
3-1.
PREPARATIONS BEFORE ADJUSTMENTS ············ 6-36
3-1-1. Equipment to Required ·················································· 6-36
3-1-2. Precautions on Adjusting ··············································· 6-37
3-1-3. Adjusting Connectors ···················································· 6-38
3-1-4. Connecting the Equipment ············································ 6-38
3-1-5. Alignment Tapes ···························································· 6-39
3-1-6. Output Level and Impedance ········································· 6-39
3-2.
SYSTEM CONTROL SYSTEM ADJUSTMENT ········ 6-40
1.
Initialization of 8, A, C, D, E, F, 1C Page Data ············· 6-40
2.
Touch Panel Adjustment ················································ 6-40
3.
Serial No. Input ····························································· 6-40
3-1.
Company ID Input ························································· 6-40
3-2.
Serial No. Input ····························································· 6-40
3-3.
SERVO AND RF SYSTEM ADJUSTMENT ··············· 6-42
1.
Cap FG Duty Adjustment (VC-311 Board) ··················· 6-42
2.
Switching Position Adjustment (VC-311 Board) ·········· 6-42
3.
Error Rate Check ··························································· 6-43
3-1.
Preparations before adjustments ···································· 6-43
3-2.
Error Rate Check ··························································· 6-43
3-4.
VIDEO SYSTEM ADJUSTMENTS ····························· 6-44
1.
S VIDEO OUT Y Level Adjustment (VC-311 Board) ·· 6-44
2.
S VIDEO OUT Chroma Level Adjustment
(VC-311 Board) ····························································· 6-44
3.
VIDEO OUT Y, Chroma Level Check (VC-311 Board) ·· 6-45
3-5.
AUDIO SYSTEM ADJUSTMENTS ···························· 6-46
1.
Playback Level Check ··················································· 6-47
2.
Overall Level Characteristics Check ····························· 6-47
3.
Overall Distortion Check ··············································· 6-47
4.
Overall Noise Level Check ············································ 6-47
5.
Overall Separation Check ·············································· 6-47
6-4.
SERVICE MODE ·························································· 6-48
4-1.
ADJUSTMENT REMOTE COMMANDER ················ 6-48
1.
Using the adjustment remote commander ····················· 6-48
2.
Precautions upon using ·················································· 6-48
the adjustment remote commander ································ 6-48
4-2.
DATA PROCESS ··························································· 6-49
4-3.
SERVICE MODE ·························································· 6-50
1.
Setting the Test Mode ···················································· 6-50
2.
Emergence Memory Address ········································ 6-50
2-1.  EMG Code (Emergency Code) ······································· 6-50
2-2.   MSW Code ····································································· 6-51
3.
Bit value discrimination ················································ 6-52
4.
Switch check (1) ···························································· 6-52
5.
Switch check (2) ···························································· 6-52
6.
Switch check (3) ···························································· 6-53
7.
Switch check (4) ···························································· 6-53
8.
LED check ····································································· 6-53
9.
Record of Use check (1) ················································ 6-54
10.
Record of Use check (2) ················································ 6-54
11.
Record of Self-diagnosis check ····································· 6-55
*
Optical axis frame and Color reproduction frame is shown
on page 6-56 and 6-57.
Page of 59
Display

Click on the first or last page to see other DCR-TRV12E / DCR-TRV14E / DCR-TRV19 / DCR-TRV19E (serv.man4) service manuals if exist.